My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7272
>
2300 - Underground Storage Tank Program
>
PR0231939
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 12:58:25 PM
Creation date
6/3/2020 9:55:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231939
PE
2361
FACILITY_ID
FA0002570
FACILITY_NAME
QUIK STOP MARKET #3144
STREET_NUMBER
7272
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
094-040-13
CURRENT_STATUS
01
SITE_LOCATION
7272 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231939_7272 WEST_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of pians&applications as originals will'be retained by EHD).' <br /> _ 1. _Site map enclosed? ___ YES[] _ _- NO[] <br /> 2: Submit copies of ICC Service.''Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> personanstalling:,or•:testing.any component-that-is repaired or-replaced. Ensure a copy of the`Site Health and-Safety <br /> Plan".is..available.on the Jobsitb.a&required by Tide 8. <br /> 3. Detailed description of work td be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing 9ocation of repairs and/or replacements. If repairing a component,describe how this will be done: (If, <br /> adding piping, UDC's, or othe�UST equipment,or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Yk <br /> 4. List of equipment to be used(Attach mangfacturer's specification sheets showing third-party approval): F <br /> r <br /> a. <br /> _ 3 <br /> 1 4 <br /> x <br />
The URL can be used to link to this page
Your browser does not support the video tag.