Laserfiche WebLink
Appendix <br /> Training Documentation <br /> for the Monitoring Program for New <br /> Underground Storage Tanks <br /> 871-D1U2 <br /> I have read and understand: <br /> 1. Veeder-Root System Operating Instructions <br /> 2. Monitoring Procedures and Response Plans for 871-D1U2. <br /> Print Name Signature Date <br /> I have reviewed the proper operation of the Veeder-Root console with a manufacturer's representative of <br /> Veeder-Root or with LLNL employee who was <br /> previously trained by a manufacturer's representative of Veeder-Root. <br /> Print Name Signature Date <br /> Attach to Operator's Monitoring Report <br /> m <br />