My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 10
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 1:15:02 PM
Creation date
6/3/2020 9:55:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 10
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 10.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring Procedures • A sump sensor(Model#PA02592000000)is a liquid probe located in a <br /> (continued) piping-containment sump above the tank. If a leak occurs in the <br /> primary piping wall, the product will drain into the secondary <br /> piping. From the secondary piping, the product will drain into the <br /> piping-containment sump, activating the alarm. <br /> The system continuously monitors idle periods in the tank. During each idle <br /> period,data are collected and combined with other idle periods to form a <br /> highly accurate database. A new leak test is performed every time new data <br /> from an idle period is added and test results can be accessed at any time with <br /> the press of a button. <br /> In the event of an alarm, the control panel will respond with a flashing red <br /> light and an audible horn. The audible alarm can be manually disabled by <br /> using the Alarm Acknowledgment Switch located on the control panel. The <br /> alarm light will continue to flash until the problem has been corrected. <br /> Equipment Maintenance <br /> Once each year,the Operator must schedule a test of the following equipment <br /> and arrange for repair,if needed: <br /> • Interstitial space sensor <br /> • Magnetostrictive probe <br /> • Piping sump sensor <br /> The test will be performed by an authorized representative of Gilbarco, or a <br /> person trained for this task by an authorized representative of Gilbarco. <br /> All equipment tests and repairs must be recorded on the Operator's Monitoring <br /> Report (see Appendix A). <br /> Operational Training—Tank System and Monitoring Equipment <br /> The Operator must read the following instruction manual: <br /> • Gilbarco System Operational Instruction Manual for the <br /> Environmental Management Console(EMC). <br /> The Operator must also read this monitoring plan and must document <br /> that the required reading has been completed. A copy of a training <br /> documentation sheet is available in Appendix B. Copies of the <br /> instruction manuals and the monitoring plan must be available at <br /> Building 879. <br /> Manufacturer's representatives from Gilbarco,Inc.,or a person knowledgeable <br /> about the system, must also review the tank system operation with the <br /> Operator,and the review must be recorded on a training documentation sheet. <br /> Training documentation will be attached to the Operator's Monitoring Record <br /> when it is completed. <br /> Monitoring and Response Program for 879-DlU1 and 879-G3U1 6 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.