Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM TANKS <br /> UNDERGROUND STORAGE TANKS - TANK PAGE 2 882-DIUI WGMG03:145 <br /> III <br /> VI. PIPING CONSTRUCTION Check all that apply) Page_2_of.2 <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SYSTEM TYPE ❑ 1.PRESSURE ®2.SUCTION-FOS ®3.GRAVITY-FOR 458 ❑ 1.PRESSURE ®2.SUCTION-FOS N 3.GRAVITY-FOR 459 <br /> CONSTRUCTION/ ❑ I.SINGLE WALL ❑3.LINED TRENCH ❑99.OTHER 460 ® 1.SINGLE WALL ❑95.UNKNOWN 462 <br /> MANUFACTURER ®2.DOUBLE WALL ❑95.UNKNOWN ❑2.DOUBLE WALL ❑99.OTHER <br /> MANUFACTURER:.Primary:US Steel/Black Iron Secondary:Ameron Dualoy 3000/1.FRP 461 MANUFACTURER:Primary:Unknown/Black Iron 463 <br /> ®1.BARE STEEL-Pri ❑6.FRP COMPATIBLE W/1001%METHANOL ®I.BARE STEEL-Pri ❑6.FRP COMPATIBLE W/100%METHANOL <br /> ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL ❑95.UNKNOWN ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL ❑95.UNKNOWN <br /> ❑3.PLASTIC COMPATIBLE W/CONTENTS ❑99.OTHER ❑3.PLASTIC COMPATIBLE W/CONTENTS ❑99.OTHER <br /> ®4.FIBERGLASS-Sec ❑8.FLEXIBLE(HDPE) ❑4.FIBERGLASS ❑8.FLEXIBLE(HDPE) <br /> ❑5.STEEL W/COATING ❑9.CATHODIC PROTECTION 464 ❑5.STEEL W/COATING ❑9.CATHODIC PROTECTION 465 <br /> VII. PIPING LEAK DETECTION Check all that apply) A descrition of the monitoring program shall be submitted to the local agency.) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING 466 SINGLE WALL PIPING 467 <br /> Note:Emergency Generator:Monthly inspections;AG piping excluded per H&S Code 25281.5(b)(3) <br /> PRESSURIZED PIPING(Check all that apply) PRESSURIZED PIPING(Check all that apply) <br /> ❑ 1.ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP SHUT ❑1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP <br /> OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION+ SHUT OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION+ <br /> AUDIBLE AND VISUAL ALARMS. AUDIBLE AND VISUAL ALARMS. <br /> ❑2.MONTHLY 0.2 GPH TEST ❑2. MONTHLY 0.2 GPH TEST <br /> ❑3.ANNUAL INTEGRITY TEST(0.1GPH) ❑3.ANNUAL INTEGRITY TEST(O.1GPH) <br /> ❑4. DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS CONVENTIONAL SUCTION SYSTEMS(Check all that apply) <br /> ❑5.DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL PIPING ❑5. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> INTEGRITY TEST(0.1 GPH) <br /> ❑6. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALUES IN BELOW GROUND PIPING) SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING) <br /> ❑7.SELF MONITORING [:17. SELF MONITORING <br /> GRAVITY FLOW GRAVITY FLOW(Check all that apply) <br /> ❑9.BIENNIAL INTEGRITY TEST(0.1 GPH) ❑8. DAILY VISUAL MONITORING <br /> ❑9. BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Check all that apply) PRESSURIZED PIPING(Check all that apply) <br /> 10.CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10.CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> ALARMS AND(Check one) ALARMS AND(Check one) <br /> ❑a.AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ❑a.AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> ❑b.AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑b.AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> DISCONNECTION DISCONNECTION <br /> ❑c.NO AUTO PUMP SHUT OFF ❑c.NO AUTO PUMP SHUT OFF <br /> ❑11.AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SHUT ❑11.AUTOMATIC LEAK DETECTOR <br /> OFF OR RESTRICTION <br /> ❑12.ANNUAL INTEGRITY TEST(0.1 GPH) ❑12.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM SUCTION/GRAVITY SYSTEM <br /> ❑13.CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS ❑13.CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all that apply) EMERGENCY GENERATORS ONLY(Check all that apply) <br /> ®14.CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF+ ❑14.CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF+ <br /> AUDIBLE AND VISUAL ALARMS AUDIBLE AND VISUAL ALARMS <br /> ❑15.AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITHOUT FLOW ❑15.AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) <br /> SHUT OFF OR RESTRICTION <br /> ❑ 16.ANNUAL INTEGRITY TEST(0.1 GPH) ❑16.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑17.DAILY VISUAL CHECK ❑17.DAILY VISUAL CHECK <br /> VIII. DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT ❑1.FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑4.DAILY VISUAL CHECK <br /> DATE INSTALLED 468 ❑2.CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS ❑5.TRENCH LINER/MONITORING <br /> NA ❑3.CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR ®6.NONE 469 <br /> DISPENSER+AUDIBLE AND VISUAL ALARMS <br /> NERIOPERATOR SIGNATURE <br /> I certify that the information provided herein is true and accurate to thel3eseo y k w dg e. <br /> SIGNATURE OF OWNER/OPERATOR DATE 470 <br /> L 10/2/2003 <br /> NAME OF OWNER/OPERATOR(print) If <br /> 471 TITLE OF OWNER/OPERATOR 472 <br /> William G.Hoppes ly Group Leader,Water Guidance and Monitoring Group,Environmental Protection Department <br /> Permit Number(For local use only) 473 Permit Approved(For local use only) 474 Permit Expiration Date(For local use only) 475 <br /> UPCF(12/99 revised) Formerly SWRCB Form B <br />