My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 12
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 4:43:06 PM
Creation date
6/3/2020 9:55:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 12
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 12.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DYNAMIC BACK PRESSURE TEST DATA (BLOCKAGE) Site: <br /> Date: <br /> NOZZLE 20 CFH 60 CFH 100 CFH PASS/FAIL NOZZLE 20 CFH 60 CFH 100 CFH PASS/FAIL <br /> (.15" Water) (.45" Water) (.95" Water) <br /> (.15" Water) (,45" Water) (.95" Water) <br /> r P6 <br /> r2 � <br /> LIQUID REMOVAL CHECK **See Long Form Test Ror Wet Failure Testing Blockage Tester Integrity: <br /> w.c.@ 5 minutes <br /> Dj_mi D/ m1 D/ mi D/ mi D/ mi D/ mi D/ mi D/ mi D/ mi <br /> DD/ mi D/ mi D/ mi D/ ml D/ mi D/ mi D/ mi D/ mi <br /> DD/ mi D/ mi D/ mi D/ mi D/ mt D/ mi D/ mi D/ mi <br /> D/ mi D/ mt ID/ mi D/ mt D/ mi D/ m1 D/ mi DL mi <br /> D/ m1 <br /> Job Complete Repairs Done to Pass Test: <br /> Not Complete Repairs Still Needed: <br /> jParts: None Drop TubeOrings Fill Adaptor Gaskets Hoses <br /> Whi Hose <br /> Nozzles Breakawa s PV Valves Others: <br />
The URL can be used to link to this page
Your browser does not support the video tag.