My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 12
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 4:43:06 PM
Creation date
6/3/2020 9:55:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 12
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 12.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'SWRCB,Januar 2002 Page of <br /> c` y <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: X Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> Other (Specify) <br /> Test Method Used: Pressure Vacuum X Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Scale 1/32" Equipment Resolution: 1/32" <br /> ' <br /> Spill Box`# <br /> P Spill Box# Sill Box# <br /> Spill Box# S t <br /> P <br /> Bucket Diameter: 14 inches 14 inches <br /> Bucket Depth: 9 %z" 10 %z" <br /> Wait time between applying <br /> pressure/vacuum/water and 10 Minuites 10 Minutes <br /> starting test: <br /> Test Start Time: 2:30 PM 2:30 PM <br /> Initial Reading(RI): 9 ''/2" 10 %" <br /> Test End Time: 4 PM 4 PM <br /> Final Reading(RF): 9 %i" 10 1/2" <br /> Test Duration: 1.5 Hours 1.5 Hours <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or 1/16"Drop 1/16"Drop <br /> Criteria: <br /> Test Result: X Pass ❑Fail X Pass ❑Rail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.