Laserfiche WebLink
'• 01/25/05 15:41 FAX 925 422 2748 EPD / WGMG 005 <br /> o. <br /> SWRCB,January 2002 FINAL DWT Page 4 of '9, 4 <br /> 5. PIPING SUMP TESTING <br /> Test Method Developed.By: ❑Sump p Manufacturer Z Industry Standard ❑Professional Engineer <br /> [ Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic Ti <br /> ❑Other(Specify) <br /> Test Equipment Used: Caldwell Sump Level Change Indicator Equipment Resolution: 0.0025" <br /> 7 ,777-7 7777771177- <br /> 777, <br /> Sump# Sump# Sump# Sump# <br /> DIESEL <br /> Sump Diameter: 36.0" <br /> Sump Depth from Top of Tank: 36.0" <br /> Sump Material: FRP <br /> Height from Tank Top to Top of 17.75" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Top of 15.5" <br /> Lowest Electrical Penetration: <br /> Condition of sump prior to testing: Clean/Dry <br /> Depth of Sump Tested' 19.75" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes®No ENA ❑Yes❑No[]NA ❑Yes❑No[INA ❑Yes❑No[INA. <br /> product and water)?" <br /> Turbine shutdown response time: i <br /> Is system programmed for fail-safe ❑yes❑No®NA ❑Yes[]No DNA ❑Yes❑No❑NA ❑Yes❑No❑NA. <br /> shutdown?* <br /> Was fail-safe verified to be ❑Yes❑No®NA ❑Yes❑No DNA ❑Yes❑No DNA ❑Yes❑No❑NA <br /> operational? <br /> Wait time between applying <br /> pressure/vacuum/water and starting 1.0 minutes <br /> test: <br /> Test Start Time: 9:00am <br /> Initial Reading(RI): 19.75" <br /> Test End Time: 9:45am <br /> Final Reading(RF): 19.75" <br /> Test Duration: 45 minutes <br /> Change in Reading(RF-Ri): 0.00" <br /> Pass/Fail Threshold or Criteria: 0.00" <br /> Test Result ZPass ❑ITail . ❑Past ❑F,14,. ❑Pass ❑Fail ❑Pass ❑Fail <br /> Was sensor removed for testing? ®Yes❑No DNA Dyes❑No SNA ❑Yes❑No DNA ❑Yes ONo DNA <br /> Was sensor properly replaced and y� No DNA ❑Yes No❑NA ❑Yes❑No DNA ❑Yes❑No DNA <br /> verified functional after testing? <br /> Comments-(include information on repairs made prior to testing,and recommended follow-up for failed tests.) <br /> Six month follow up testing after construction. <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(")is"NO",then the entire sump should be tested. (See S .CB LG-160) <br />