My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 12
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 4:43:06 PM
Creation date
6/3/2020 9:55:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 12
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 12.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB -22-2005 09:15AM FROM- 1 ' +9255517695 T -T51 P.003 F-963 <br />SITE SAFETY PLAN <br />CLIENT NAME: <br />COMPANY NAME: <br />PROJECT ADDRESS: � dQy �.b S"�' �O►.�t ' �,u�-ez.�z-c ��+. <br />PROJECT NUMBER: <br />A Site Safety Plan (SSP) has been designed to address safety provisions during the project. Its Purpose is to <br />provide established procedures to protect all on-site personnel from direct skin contact, inhalation, or ingestion <br />of potentially hazardous materials that may be encountered at the site. The SSP establishes personnel <br />responsibilities, personal protective equipment standards, decontamination procedure, and emergency action <br />plans. <br />All personnel participating in the field must be trained in the general and specific hazards. All site personnel, <br />project manager and/or site safety officer may impose any other procedures that they believe are necessary for <br />safe operations. <br />This plan is prepared to inform all field personnel, contractors, and subcontractors of the potential hazards on <br />the site, However, each contractor or subcontract must assume direct responsibility for his own employees' <br />health and safety. <br />PLAN PREPARED B__`=e-v <br />PLAN APPR0VED BY <br />PLAN REVISED BY: <br />POSSIBLE &\ZARDS ON THE JOB: <br />1. <br />6. <br />11. <br />2. <br />7, <br />12. <br />3.4.� . <br />8. <br />13. <br />4-t-Sk . <br />9. <br />14. <br />S. <br />10. <br />15. <br />REQUIRED PFRSONAL PROTECTIVE EQUIPMENT FOR THE PROJECT: <br />9. <br />2. <br />6. <br />10. <br />3. 7. <br />11. <br />4. <br />8_ <br />12. <br />
The URL can be used to link to this page
Your browser does not support the video tag.