My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 12
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 4:43:06 PM
Creation date
6/3/2020 9:55:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 12
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 12.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 4" 0 <br />OPW Double Fill Configuration shall be allowed for installation provided that no <br />more than two fill and two vapor return points are installed on any single <br />underground storage tank and that no offset of the vapor recovery riser pipe is <br />installed. An example of a OPW Dual Fill configuration in shown in Figure 2C. <br />2. The OPW Double Fill Configuration can also be used in the single fill mode if <br />applicable. However, if used in double fill configuration, two vapor return hoses <br />shall be connected to the dual fill configuration with at least one connection to <br />each cargo tank(s) used to simultaneously deliver gasoline through two product <br />hoses into a single tank. <br />Vapor Recovery Riser Offset <br />The vapor recovery tank riser may be offset from the tank connection to the vapor <br />recovery Spill Container provided that the maximum horizontal distance (offset <br />distance) does not exceed 20 inches. One example of an offset is shown in <br />Figure 2E. <br />2. The vapor recovery riser shall be offset up to 20 inches horizontal distance with <br />use of commercially available, 4 inch diameter steel pipe fittings. <br />Tank Gauge Port Components <br />The tank gauge adaptor and cap are paired. Therefore, an adaptor manufactured by <br />one company shall be used only with a cap manufactured by the same company. <br />Connections and Fittinas <br />All connections and fittings not specifically certified with an allowable leak rate shall not <br />leak. The absence of vapor leaks may be verified with the use of commercial liquid leak <br />detection solution (LDS) or by bagging, when the vapor containment space of the <br />underground storage tank is subjected to a non -zero gauge pressure. (Note: leak <br />detection solution will detect leaks only when positive gauge pressure exists). <br />Maintenance Records <br />Each GDF operator/owner shall keep records of maintenance performed at the facility. <br />Such record shall be maintained on site or in accordance with district requirements or <br />policies. The records shall include the maintenance or test date, repair date to correct <br />test failure, maintenance or test performed, affiliation, telephone number, and name of <br />individual conducting maintenance or test. An example of a Phase 1 Maintenance <br />Record is shown in Figure 2F. <br />Executive Order VR -102-E, OPW Phase I Vapor Recovery System, Exhibit 2, Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.