Laserfiche WebLink
IFIED PROGRAM CONSOLIDATED F <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Page 1 of 2) 879-DlUl and 879-G3U1 PRAD09:186 <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 490-1, <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ® 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): 879-DlUl and 87943U1 <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as Facility Name or DBA) 3 <br /> Lawrence Livermore National Laboratory -Site 300 <br /> BUSINESS SITE ADDRESS Corral Hollow Road 103 I CITY South of Tracy, CA 104 <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> §y <br /> the a ui ment manufacturers'instructions or annuall whichever is more fre uent.Such work must be erformed b ualified personnel.[23 CCR§2632,2634,2638,26411 <br /> ................SL_.p..-- .._......_......__..._.....-_........................ .......,.._._............................Yz........................................_..._............................9..........................._._..._..._..................................P._...................................Y.....9........................... ....................................................................................................._.__._. <br /> EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHERS eci 490-3a. <br /> MONITORING E <br /> Q (Specify): 490-3b. <br /> III. MONITORING LOCATIONS <br /> ® 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634) 4904. <br /> IV. TANK MONITORING`IS PERFORMED USING THE FOLLOWING METHOD(S) hah ack all <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,2634] <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM '90-6- <br /> PANEL MANUFACTURER: Gllbarco 490-7. MODEL#: EMC 490-8. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490-9. MODEL#(S): 794390-420 annulary 490-10. <br /> ....................................................................................................................._..._..-.......................................... .._.._----.....................................................-......... ..............._............ <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).123 CCR§2643]ATG is used for inventory purposes. 490-11. <br /> PANEL MANUFACTURER: Gllbarco 490-12. MODEL#: EMC 490-13. <br /> IN-TANK PROBE MANUFACTURER: Veeder-Root 490-14. MODEL#(S): Mag 1 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> 490-1s.PROGRAMMED TESTS: ❑ a.0.1g•P•h. b.0.2 g.p.h. c.OTHER(S(Specify): a90-19. <br /> _ <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.11 490-20 <br /> ...... ..........................................................................................................................................._ <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§2645] TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490 2 z1. <br /> ................................................................................................._............._............ <br /> ❑ 5.TANK INTEGRITY TESTING PER 123 CCR§2643:1] 490-23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER( PecifY) aS 490-20-. <br /> ..... <br /> ❑ <br /> 99.OTHER(Specify): 490-27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) hat a k ill <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> [23 CCR§2 36] SECONDARY CONTAINMENT IS: N a.DRY El b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-29. <br /> PANEL MANUFACTURER: Gllbarco 490-30. MODEL#: EMC 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490-31 MODEL#(S): 794380-2055(sumps) 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. srso,ut.rt.sm I@ a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN.....,...,.® a.YES ❑ b.NO 490-35. <br /> ......_....._..--- --._....-_......................._......_._.._..............................................................................................................---................................................__........._..................._..............__.._......._.................................._.............................................................................................------...................._.........._.... <br /> ® 2. MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§26361 <br /> MLLD MANUFACTURER(S):VMI-879-GWI,NIA-879-D1 U1 490-37. MODEL#(S): LD-2000 N/A 490-38. <br /> ................................._................................................................................._..__.................. ...............-...-.-....................................................._....... ...............___ <br /> ❑ 3. ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§2636] 490-39. <br /> ELLD MANUFACTURER(S): 49040 MODEL#(S): 49041. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49043. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49044. <br /> ❑ 4.PIPE INTEGRITY TESTING. 49045. <br /> TEST FREQUENCY: ❑ a.ANNUALLY [Ib.EVERY 3 YEARS Elc.OTHER(Specify) 49049046. <br /> 7. <br /> _._._....................._.................................--................-..............................................................................................................._............................................... <br /> ❑ 5.VISUAL PIPE MONITORING. 49048. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049. <br /> *Allowed for q nitorin of unburied em en enerator fuel i in onl er HSC 25281.5 3 <br /> ® 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(a)(3)] 879-DIU1 490-50. <br /> ...................................................._.........._._................._._............................._..---........._..................................................................................................................................................................._.._..........................................-.........__.............................................................................................................................................................-_............. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> ..................................................._..._................__._........_...._..............................-..._........_..........._._..._........................................................................_...................................................................... <br /> ❑ <br /> 99.OTHER(Specify) 49053. <br /> UPCF UST-D(12/2007)-1/6 www.unidoes.org <br />