Laserfiche WebLink
11 <br />Monitoring System Certification <br />F. In -Tank Gauging / SIR Equipment: <br />E <br />® Check this box if lank gauging is used only for inventory control, <br />❑ Check this box if no tank gauging or SIR equipment is installed, <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />® Yes <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />® Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />19 Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />0 Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />0 Yes <br />D No* <br />Were all probes reinstalled properly? <br />0 Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />In Section <br />H. below. describe how and when these deficiencies were nr will he enrrected. <br />G. Line Leak Detectors (LLD): <br />Complete the following checklist: <br />0 Check this box if LLDs are not installed. <br />* Yes <br />❑ No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />I <br />❑ N/A <br />(Check all that apply) Simulated leak rate: C9 3 g.p.h.; ❑ 0.1 g.p.h; ❑ 0.2 g.p.h. <br />* Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />* Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />* Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />10 N/A <br />* Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />0 N/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />C@ N/A <br />malfunctions or fails a test? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />N N/A <br />Yes <br />❑ No* <br />Were all items on the equipment maintenance checklist completed? <br />manufacturer's® <br />In Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />Unleaded system is pressurized, Diesel is safe suction. <br />UN, 036 — 3/4 <br />ESH-EFA-TKS- 18-l5666-S?vVEM:mw <br />Page 3 of 3 <br />www.unidoes.org <br />Rev. 01/17/08 <br />