My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2022 4:38:41 PM
Creation date
6/3/2020 9:55:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 3
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br /> Introduction....................................................................................... <br /> RegulatoryRequirements................................................................................................................ 1 <br /> Underground Diesel-Fuel System Chronology............................................................................... l <br /> GeologicSetting..............................................................................................................................4 <br /> SoilSampling..................................................................................................................................6 <br /> Laboratory Analytical Methodology............................................................................................. 12 <br /> LaboratoryAnalytical Results....................................................................................................... 12 <br /> LeachingPotential Analysis.......................................................................................................... 14 <br /> Conclusion.................................................................................................................................... 18 <br /> References..................................................................................................................................... 19 <br /> List of Tables <br /> Table 1. Dates of Soil Sampling Events................................................................... <br /> Table 2. Analytical results from soil samples collected from the 850-DlU1 tank <br /> excavation 13 <br /> Table 3. Site characteristics and scores for diesel-containing soil............................................... 17 <br /> Table 4. Site characteristics and scores for diesel-containing bedrock........................................ 17 <br /> List of Figures <br /> Figure 1. Locations of Building 850 and the 850-DlUl tank excavation,LLNL, <br /> Site 300. <br /> .................................................................................................................... <br /> Figure 2. Location of Building 850 and the 850-DlUl tank excavation......................................3 <br /> Figure 3. Ground water elevation contour map for the Building 850 Area, third <br /> quarter1990..............................................................................................................5 <br /> Figure 4. Location of exploratory boreholes at the 850-DlU1 tank excavation............................7 <br /> Figure 5. Geologic cross section across the 850-DlUl tank excavation,north to south...............9 <br /> Figure 6. Geologic cross section across the 850-D1U1 tank excavation, east to west. ............... 10 <br /> Figure 7. Location of cross sections at 850-DlUl tank excavation............................................. 11 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.