My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2022 4:38:41 PM
Creation date
6/3/2020 9:55:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 3
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UCRL-AR-103194 <br /> False alarm <br /> If, after responding to an alarm,the Operator determines that there is no <br /> leak,the Operator must arrange for the alarm system to be checked and,if <br /> necessary,repaired to prevent recurrence of a false alarm. A false tank alarm <br /> could be the result of water condensing on the liquid probe. The Operator <br /> must record all false alarms on the Operator's Monitoring Report. <br /> Removal Procedures <br /> Leaks in either the tank or the piping might require removal of some or all of the <br /> product from the tank system. The specific removal procedures are dependent upon the <br /> location of the leak in the tank system. The Operator and the Environmental Analyst <br /> must authorize the start of removal procedures. The actual removal operation is the <br /> responsibility of EPD's HWM Division or Plant Engineering(PE). <br /> Removal equipment <br /> The Operator and the Environmental Analyst will determine the equipment to <br /> be used for the removal operation. The equipment can either be(1)PE's 5000- <br /> gallon truck trailer located at Bldg 844 at Site 300 or(2)a contractor's 5000-gallon <br /> vacuum truck. The Operator can authorize use of PE's 5000-gallon tanker truck <br /> located at Bldg 844 at Site 300[PE contact is Maintenance Section Leader, <br /> telephone no. (415)423-5316]. If PE's equipment is not used and a contractor's <br /> equipment is needed,HWM currently holds contracts with the following hazardous <br /> waste haulers that could perform removal operations: <br /> IT Corporation W Vacuum <br /> 1680 Rogers Ave. 3400 N. Manor St. <br /> San Jose, CA Bakersfield, CA <br /> The Operator must contact the HWM Shipping Coordinator[telephone no. <br /> (415) 423-1996],who will make the necessary arrangements with an appropriate <br /> hazardous waste hauler. TT Corporation is available on a 24-hour basis and MP <br /> Vacuum is available during business hours. <br /> Once a year,PE will perform maintenance operations on its removal <br /> equipment. <br /> Primary tank leak <br /> A leak in the primary tank will cause product to drain into the secondary tank. <br /> The contents of the primary and secondary tanks must be pumped into an <br /> aboveground portable tank or container and properly disposed of according to <br /> applicable laws and regulations. The tank system must remain out of service until <br /> the primary tank is repaired. <br /> Piping leak <br /> If there is a leak in the primary piping,the contents of the piping sump must be <br /> pumped immediately into an aboveground portable tank or container and properly <br /> disposed of according to applicable laws and regulations. The piping must be <br /> tested to determine the location of the leak and must remain out of service until the <br /> Tank 882-DIUI 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.