Laserfiche WebLink
UCRL-AR-103194 <br /> Weekly Electronic Monitoring Equipment Check <br /> • Check: 1.Verify that the Green Light for Power is ON. <br /> 2.Verify that the Red Light for the Tank Alarm is OFF. <br /> 3.Verify that the Red Light for the Piping Alarm is OFF. <br /> 4.Verify that the Leak-Alert Alarm is operating by pressing the button on the panel; <br /> an audible alarm(beep)should sound and the red lights for the tank alarm and the <br /> piping alarm should go ON. <br /> • If any of the four items are not functioning properly,notify the Tank Operator. Initial the calendar box <br /> for the appropriate day when this check is completed. <br /> MONTH OF MONTH OF <br /> MON TUE WED THU FRI MON TUE WED THU FRI <br /> MONTH OF MONTH OF <br /> MON TUE WED THU FRI MON TUE WED THU FRI <br /> ff _j _j :3 <br /> j P P - n <br /> B-2 Monitoring Program for New Underground Storage Tank <br />