Laserfiche WebLink
UCRL-AR-103194 0 0 <br /> Responsibilities for Tank 882—DIUI <br /> Responsible Personnel <br /> Operator (OP) <br /> Environmental Analyst (EA) <br /> Hazardous Waste Management Division (HWM) <br /> Plant Engineering (PE) <br /> Wastewater and Tanks Group (WATS) <br /> Monitoring Procedures <br /> Test electronic monitoring equipment(arrange for repair,if needed)and keep records <br /> of the activities on the Operator's Monitoring Report. (OP) <br /> Alarm Response <br /> Remove tank's annular-space liquid probe and examine it for diesel. (OP) <br /> Inform EA of system leak. (OP) <br /> Inspect piping sump. (OP) <br /> Inform WATS Group of confirmed leak. (EA) <br /> Check out alarm system if alarm proves to be false. (OP) <br /> Repair alarm system,or call for repair. (OP) <br /> Record false alarm response on Operator's Monitoring Report. (OP) <br /> Removal Procedures <br /> Authorize start of removal procedures. (OPIEA) <br /> Oversee removal operation. (HWHIPE) <br /> Authorize use of HWM pump and truck. (HWM) <br /> Authorize use of PE pump and truck. (PE) <br /> Call contractor if LLNL pump and truck are unavailable. (HWM) <br /> Oversee contractor's work. (HWM) <br /> Pump out product. (HWM) <br /> Authorize disposal of product. (HWM) <br /> Call manufacturer for tank repairs. (OP) <br /> Reporting <br /> Operator's Monitoring Report (OP) <br /> Recordable Release Form (OP) <br /> Reportable Release Verbal Notification (WATS) <br /> Reportable Release Form (WATS) <br /> H-2 Monitoring Program for New Underground Storage Tank <br />