My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2022 4:38:41 PM
Creation date
6/3/2020 9:55:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 3
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UCRL-AR-103194 0 0 <br /> Responsibilities for Tank 882—DIUI <br /> Responsible Personnel <br /> Operator (OP) <br /> Environmental Analyst (EA) <br /> Hazardous Waste Management Division (HWM) <br /> Plant Engineering (PE) <br /> Wastewater and Tanks Group (WATS) <br /> Monitoring Procedures <br /> Test electronic monitoring equipment(arrange for repair,if needed)and keep records <br /> of the activities on the Operator's Monitoring Report. (OP) <br /> Alarm Response <br /> Remove tank's annular-space liquid probe and examine it for diesel. (OP) <br /> Inform EA of system leak. (OP) <br /> Inspect piping sump. (OP) <br /> Inform WATS Group of confirmed leak. (EA) <br /> Check out alarm system if alarm proves to be false. (OP) <br /> Repair alarm system,or call for repair. (OP) <br /> Record false alarm response on Operator's Monitoring Report. (OP) <br /> Removal Procedures <br /> Authorize start of removal procedures. (OPIEA) <br /> Oversee removal operation. (HWHIPE) <br /> Authorize use of HWM pump and truck. (HWM) <br /> Authorize use of PE pump and truck. (PE) <br /> Call contractor if LLNL pump and truck are unavailable. (HWM) <br /> Oversee contractor's work. (HWM) <br /> Pump out product. (HWM) <br /> Authorize disposal of product. (HWM) <br /> Call manufacturer for tank repairs. (OP) <br /> Reporting <br /> Operator's Monitoring Report (OP) <br /> Recordable Release Form (OP) <br /> Reportable Release Verbal Notification (WATS) <br /> Reportable Release Form (WATS) <br /> H-2 Monitoring Program for New Underground Storage Tank <br />
The URL can be used to link to this page
Your browser does not support the video tag.