Laserfiche WebLink
09 00 <br /> 10S <br /> Notes and 11wructions for Comm ting c:e® c,,,iex and Health Pt—an <br /> 7 . WARNING -- COMPLETE ALL ENTRIES; IF ITEM IS NOT APPLICABLE TO <br /> PROJECT, OR METHOD OF WORK BEING USED ENTER 'NOT APPLICABLE-, <br /> "NIA", OR "- INCOMPLETE FORMS WILL 13E GROUNDS FOR <br /> REJECTION OF PLAN WITHOUT REVIEW OR COMMENT. <br /> 2. Entries do not need to be limited to space provided on forms. N additional space is <br /> required, affix additional sheets of paper(to ease photocopying of plans, do not write on <br /> backs of forms). Clearly cross reference form entries and extension sheets. <br /> 3. Supplemental information, such as contractor standard operating procedures, <br /> checklists, or protocols can be submitted to expand or Illustrate answers. Affix <br /> } supplemental information directly to applicable form. Clearly cross reference form <br /> entries and supplemental information. If supplemental Information sheets contain <br /> information extraneous to the project and plans, fine extraneous information out <br /> Emeroencv Information <br /> LLNL will provide Location of Nearest Telephone At Site. <br /> Qnsite raanizatton and Coordinafion <br /> LLNL will complete portion of form entitled "Lawrence Livermorenal Laboratory. <br /> :. Site u rvtsion and Responsibilities <br /> • No Notes. <br /> Pre-Job Start SifeiX and Health Briefing <br /> • Provide detailed outline of items to be discussed during pre-job start safety and health <br /> briefing ('tailgate meeting'). <br /> Dai x SafetX and Hearth 13EI&LW1J1&C&W <br /> If mandatory daily safety and health briefings are planned in advance of project, <br /> complete cne copy of record for each planned day on site and submit with remainder of <br /> plan. On each days record, provide a detailed outline of items to be discussed during <br /> briefing. During project. annotate/amend records to indicate any changes from pre- <br /> planned briefing. On a daily basis, submit signed copies of day's record to Plant <br /> Engineering Construction Inspector for filing in project file. <br /> a <br />