Laserfiche WebLink
00 00 <br /> 000107 <br /> `'. C®nfined Uace Entry Procedures SumQlafY <br /> Attach copy of company's confined space entry procedures to this sheet. Cross out <br /> portions of the procedures submitted that will not be used on the project. <br /> Decontamination Procedures Summar�r <br /> Attach additional pages as necessary to completely outline decontamination procedures to <br /> be used on site. <br /> • Copy of company's standard decontamination procedures can be attached if properly <br /> cross-referenced against questions asked on summary sheet. Cross out portions of the <br /> procedures submitted that will not be used on the project. <br /> Bite Access Control and Security <br /> • In each box, identity specific type of material/equipment to be used, and k>cations where <br /> material will be used. Examples: <br /> Warning Signs - 'Danger, Construction Zone - Hard Hats Required'signs shall <br /> be posted at all entrances into the worksite. <br /> • Caution Tape - Red Danger, Contaminated Area tape wX be used to separate the <br /> ( Contamination Redluction Zone from the Clean Area. <br /> `�- - Fend - Yellow Pblyethylene ®Snow' Fencing wrN be used to isolate the soil <br /> pile. <br /> Plastic Sheeting - Nylon filament reinforced 20 mr7 polyethylene sheeting will <br /> be used to cover the soil pile at the end of each days work. <br /> Emergency Procedures Summary <br /> Attach additional pages as necessary to completely outline emergency procedures planned <br /> for the site. <br /> • Copy of company's standard emergency procedures can be attached if properly cross- <br /> referenced against questions asked on summary sheet. Cross out portions of the <br /> procedures submitted that will not be used on the project. <br /> Emolovee Training and Medical Surveillance Summary <br /> • Duplication of sheet may be necessary. <br /> List of employees that may be assigned to project. The intent herein is to ensure proper <br /> training and medical surveillance of any and all workers on-site. <br /> Attach cgl2igs of initial and refresher training certificates for each listed employee. <br /> ( Arrange certificates in same sequence as employees are fisted on summary sheer <br />