Laserfiche WebLink
APPENDIX D <br /> FIGURES & PHOTOGRAPHS OF THE <br /> TANK CLOSURE ACTIVITIES <br /> FIGURE 1: Sample Locations From The Soil Pile For The Closure Of UST 836-DlUl <br /> FIGURE 2: 836-DlUl Excavation Sampling Locations <br /> PHOTOGRAPH 1: View of the UST 836-DlU1 being removed from the excavation. <br /> PHOTOGRAPH 2: View of UST 836-DlU1 being mounted onto Erickson truck. Hold- <br /> down straps are being placed. <br /> PHOTOGRAPH 3: View of excavation after UST 836-DlUl has been removed. <br /> Photograph taken prior to the supply and return pipe lines being removed at <br /> the concrete/asphalt interface,where the piping was then grouted and <br /> sealed closed in-place. <br /> PHOTOGRAPH 4: View of UST 836-DlUl excavation after soil sample has been collected. <br /> PHOTOGRAPH 5: View of excavated native and backfill soil located onvisqueen. <br /> PHOTOGRAPH 6: View of excavated native and backfill soil covered with visqueen. <br /> D-1 <br />