Laserfiche WebLink
Western Operations <br /> 1=Quarry Lane <br /> P.O. Mx 9019Clayton <br /> Pleasanto", CA 94566 ENVIRONMENTAL <br /> (510)426-2600 <br /> Fa)e(51M 426-MO6 CONSULTANTS <br /> February 23, 1994 <br /> Mr. Marion Heaton <br /> LAWRENCE LWERMORE NATIONAL LABORATORY <br /> P.O. Box 808, L-633 <br /> Livermore, California 94550 <br /> Clayton Project No. 38641.00 <br /> Subject: Tank Integrity Testing Results <br /> Dear Mr. Heaton: <br /> Clayton Environmental Consultants, Inc. is pleased to report the results and <br /> observations of the tank integrity tests recently completed at: <br /> Lawrence Livermore National Laboratory <br /> Budding 871 (Site 300) <br /> Tracy, California <br /> The tank was tested on February 18, 1994, using the Homer EZY-CHEK tank testing <br /> system. <br /> The results of the tests are provided below. <br /> ... ....... -... .......... <br /> muffliw <br /> 871-DIUI 2,000 Diesel High -0.0169 <br /> GPH @ 95% confidence of <.1 as accepted by the State of California and the <br /> Environmental Protection Agency. <br /> The tank was shown to be "product tight." <br /> ACrr&NV"1-0Mn <br /> Clayton Environmental Consultants,Inc. 0 Detroit 0 NmYork/hlewark e Admu e San Francisco • Las Angeles <br /> Honolulu * Windsor,ON e Toronto 0 Birmingham,U.K. * London,U.K. e Southampton,U.K. • Gateshead,U.K. <br />