My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 7
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 1:28:25 PM
Creation date
6/3/2020 9:55:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 7
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 7.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
509
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Community Development Department <br /> 1810 E. Hazelton Avenue. Stockton.CA 95205 <br /> Development Services Phone: (2(N)469-3120 <br /> Planning Phone: (209) 468-3120 <br /> Building Phone: (2(X1)-169-3123 <br /> Neighboncuxxh Preservation Phone: (20))W-3021 <br /> BACKFILL EXCAVATION(7ERT(FICA'IE <br /> Project Location L.LNL S 1 lmr ,:b.D. V)9 <br /> Owner L L N L _Phone No. S)O-(-a3- 9 111 <br /> Contractor —PETmoi fag-. PhoneNo.`IOJ-gS-SJ-%;n License No. SCIGA55 <br /> INDICATE METHOD OF BACKFILL Q(.;ALITY ASSURANCE <br /> 1. Submission of Soil Engineers Compaction Report within 30 days of project completion.or <br /> 2. Submission of veriticAtion.e.e..load ticket.within 30 days of project completion that one of the following <br /> materials was placed in the excavation in 12"lifts: <br /> A. Pea_ravel-smooth.rounded material not more than one-half(112)inch in diameter. <br /> B. Crushed rock-sell'-compiming material not more amn three-quarters(314)inch in cross sectional <br /> measurement. (t Ise of crushed ruck will not he permitted for backfill if contact will be made <br /> between the backfill material and tanks/pipes mace of poly resin glass or similar materials.) <br /> DECLARATION <br /> CI hereby certify that a Soil Engineers Compaction Report will be submitted within 30 days of project completion.or <br /> submission of verification that the select material described above will be placed at a minimum of five(5)cubic yards per <br /> 100()*a! tank displacement and that the entire excavation will be backfilled and compacted to insure compliance with the <br /> Uniform Buildin_Code Appendix Chapter 70. <br /> Fan p N ATfPiLi, <br /> Naune(Print) <br /> N5 n,oc-T10h3 YYIANAV4l1. <br /> Title(Print) <br /> S ienauure <br /> Shall be the responsible managing employee on the license or authorized agent. <br /> 6/91-LC/BECERT.DOC <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.