Laserfiche WebLink
000206 <br /> Nates and InstructionG for Completing Sltp Safety and Heaish Plan <br /> I . WARNING -- COMPLETE ALL ENTRIES; IF ITEM IS NOT APPLICABLE TO <br /> PROJECT, OR METHOD OF WORK BEING USED ENTER 'NOT APPLICABLE", <br /> "N/A", OR "----". INCOMPLETE FORMS WILL BE GROUNDS FOR <br /> REJECTION OF PLAN WITHOUT REVIEW OR COMMENT. <br /> 2. Entries do not need to be limited to space provided on forms. If additional space is <br /> required, affix additional sheets of paper (to ease photocopying of plans, do not write on <br /> backs of forms). Clearly cross reference form entries and extension sheets. <br /> 3. Supplemental information, such as contractor standard operating procedures, <br /> checklists, or protocols can be submitted to expand or illustrate answers. Affix <br /> supplemental information directly to applicable form. Clearly cross reference form <br /> entries and supplemental information. If supplemental information sheets contain <br /> information extraneous to the project and plans, line extraneous information out. <br /> Emergency Information <br /> LLNL will provide Location of Nearest Telephone At Site. <br /> onsite Oroanization and Coordination <br /> LLNL will complete portion of form entitled "Lawrence Livermore National Laboratory". <br /> Site Supervision and Responsibilities <br /> No Notes. <br /> Pre-Job Start Safety and Health Briefing <br /> Provide detailed outline of items to be discussed during pre-job start safety and health <br /> briefing ("tailgate meeting"). <br /> Daily Safety and Health Bri find Record <br /> • If mandatory daily safety and health briefings are planned in advance of project, <br /> complete one copy of record for each planned day on site and submit with remainder of <br /> plan. On each day's record, provide a detailed outline of items to be discussed during <br /> briefing. During project, annotate/amend records to indicate any changes from pre- <br /> planned briefing. On a daily basis, submit signed copies of day's record to Plant <br /> Engineering Construction Inspector for filing in project file. <br />