My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 7
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 1:28:25 PM
Creation date
6/3/2020 9:55:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 7
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 7.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
509
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County • �� �� <br /> Community Development Department <br /> 1810 E. Hazelton Avenue. Stx)ckton.CA 95205 <br /> Nvelopment Services Plume: (2(X))-tC,tt-t12u <br /> Planning Phone: (2(M)) 36R-31211 <br /> Building Phone: (209)369-3123 <br /> Neightxirhoxxl Preservation plx)ne: (2(M))-469-3(121 <br /> BACKFILL EXCAVA'rioN CERTIF'ICA'TE <br /> Project Location LLN L S 4 W r--.,-by l Lz� V)9 <br /> Owner LLN L _Phone No. <br /> Contractor f TTLOT LX-- -Phone No.4-019-S YM License Nei. S°lQac1S <br /> INDICATE METH()I)OF BACKFILL QUALITY ASSURANCE <br /> 1. Suhmission of Soil Engineer's Compaction RM)n within 3O days of project completion,or <br /> _ 2. Submission of verification.e.__.,load ticket.within 30 days of project completion that one of the following <br /> materials was placed in ttte excavation in 12"lifts: <br /> %A A. Pea gravel-snuxxh.rounded nuaerial nut more than one-half(112)inch in diameter. <br /> _ B. Crushed rock- It'-cump�Ktim:material cx►t more that three-quarters(313)inch in cross-sectional <br /> measurement. 0 Ise of crushed rock will not be permitted for backfill if contact will be made <br /> between tate backfill material antJ t:utks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> 1 hereby certify that a Soil Engineers Compaction Report will be submitted within 30 days of project completion.or <br /> submission of verification that the select material described above will be placed at a minimum of five(5)cubic yards per <br /> 1000 gallon tank displacement and that the entire excavation will be backfilled and compacted to insure compliance with the <br /> Uniform Building Code Appendix Chapter 70. <br /> �n N �Trk PI <br /> Name(Print) <br /> CDNSTrwc-T1OX) YYIAf�AC�SJ1. <br /> Title(Print) <br /> Signature <br /> Shall be the responsible managing employee on the iicceme or autlumzed agent. <br /> 6/91-LC/BECERT.D(K <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.