Laserfiche WebLink
Notes and Instructions tot Com Meting Site Safety and Hearth Plan <br /> 1 . WARNING — COMPLETE ALL ENTRIES; IF ITEM IS NOT APPLICABLE TO <br /> PROJECT, OR METHOD OF WORK BEING USED ENTER 'NOT APPLICABLE", <br /> "NIA", OR "•-_-". INCOMPLETE FORMS WILL BE GROUNDS FOR <br /> REJECTION OF PLAN WITHOUT. REVIEW OR COMMENT. <br /> 2. Entries do not need to be limited to space provided on forms. If additional space is <br /> required, affix additional sheets of paper (to ease photocopying of plans, do not write on <br /> backs of forms). Clearly cross reference form entries and extension sheets. <br /> 3. Supplemental information, such as contractor standard operating procedures, <br /> checklists, or protocols can be submitted to expand or illustrate answers. Affix <br /> supplemental information directly to applicable form. Clearly cross reference form <br /> entries and supplemental information. If supplemental information sheets contain <br /> information extraneous to the project and plans, line extraneous Information out. <br /> E_mergl� Information <br /> LLNL will provide Location of Nearest Telephone At Site. <br /> Qnsite Organization and Coordination <br /> - LLNL will complete portion of form entitled 'Lawrence Livermore NationalLaboratory'. <br /> Site Su®ervision and ResDonalbllltles <br /> No Notes. <br /> Pre•Job Start Safety, and Health Briefing <br /> Provide detailed outline of items to be discussed during pre-job start safety and health <br /> briefing ('tailgate meeting'). <br /> Dail Sa y and Health Briefing Record <br /> If mandatory daily safety and health briefings are planned in advance of project, <br /> complete one copy of record for each planned day on site and submit with remainder of <br /> plan. On each day's record, provide a detailed outline of items to be discussed during <br /> briefing. During project, annotatelamend records to indicate any changes from pre- <br /> planned briefing. On a daily basis, submit signed copies of day's record to Plant <br /> Engineering Construction Inspector for filing in project file. <br />