My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 9
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 2:14:03 PM
Creation date
6/3/2020 9:56:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 9
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 9.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UBLIC HEALTH SERVICES <br /> SAN JOAQUIN COUNTY <br /> Jogi Khanna M.D.,M.P.H. <br /> Health Officer <br /> P.O.Box 2009(1601 East Hazelton Avenue),Stockton,California 95201 <br /> (209) 468-3400 <br /> APPLICATION FOR PERMIT TO CLOSE <br /> UNDERGROUND STORAGE TANKS STORING HAZARDOUS MATERIALS <br /> GENERAL INSTRUCTIONS: <br /> [ ] 1. Submit all information in triplicate. Answer all questions,leaving no blanks. One copy will be returned <br /> to the applicant with comments. <br /> [ ] 2. Include a detailed site map on a separate sheet of paper, showing the location of the tank(s), piping, <br /> streets, adjacent properties (north toward the top of the page), nearby septic tanks, leachfields, wells, <br /> buildings,underground public utility lines(including water,sanitary sewer,and storm sewer),and <br /> distance of piping from tank to dispensers. If underground utilities are not included on the site map,you <br /> must state in writing that USA Dig will be contacted prior to excavation activities. <br /> [ ] 3. Complete page 3,"Application for Underground Tank Closure Permit". <br /> [ ] 4. Complete page 9,"Authorization to Release Analytical Data". This form must be signed and dated by <br /> the OWNER/OPERATOR of the facility. <br /> [ ] 5. Submit the appropriate fees and complete page 11,the"Underground Tank Program Fee Worksheet". <br /> ( ] 6. Complete all questions on page 10, the Public Health Services-Environmental Health Division (PHS- <br /> EHD)"Underground Storage Tank Dispositing Tracking Record", except those requiring a signature and <br /> date of tank removal. The holder of the permit shall be responsible for ensuring that this form is <br /> completed and returned to PHS-EHD within 30 days of the tank removal. <br /> [ ] 7. Submit a "Site Health & Safety Plan" as an addendum to this application, to address all potential hazards : <br /> this specific job site. Refer to the Site Safety Plan Guidance Document for specifics. <br /> [ ] 8. If facility is located outside of the city limits, submit a "Backfill Excavation Certificate" as required by the <br /> County of San Joaquin Building Department and the incorporated City Building Department,pursuant to the <br /> uniform Building Code STD 70-11. <br /> [ ] 9. -Obtain a"Grading and Excavation Permit" from the City of Tracy Building Division prior to PHS-EHD <br /> approval of the closure plan. <br /> [ ] 10. The maximum review time for Closure Plans is 15 working days from receipt of the adequately <br /> completed plan. If gross deficiencies are identified,an addendum will be required with a$78.00/hour <br /> fee and the review will begin on the date of resubmittal. <br /> [ ] 11. Submit verification of the fire permit from the appropriate fire district at the removal inspection. <br /> [ ] 12. Advance inspection notice of at least 48 hours is required by PHS-EHD. <br /> EH23 007(11/l/92) <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.