My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 9
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 2:14:03 PM
Creation date
6/3/2020 9:56:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 9
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 9.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLINSOTOCOL FOR ROUTINE TANK REMALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall <br /> be representative of native soils beneath the tank's invert (tank's bottom)at a collection depth not to exceed 2 -4 <br /> feet. If contamination is documented during closure,an Unauthorized Release Notification must be completed and <br /> submitted within five (5) working days pursuant to California Health & Safety Code, Section 25295. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> < 1,000 1 per Tank Fill OR Pump End of Tank <br /> 871- 1,000-10,000 2 per Tank 1 at each End of Tank <br /> D1U1 <br /> > 10,000 3 or More per Tank Ends and Middle OR generally <br /> spaced along the length of the Tank <br /> PIPING AND STOCKPILE <br /> 1 PIPING SOIL SAMPLES 1 1 Sample eve 20 lineal feet <br /> 1 TANK& PIPING STOCKPILE'SAMPLES' 1 2 Samples every 50 cubic ards <br /> WATER IS PRESENT IN TANK PIT <br /> TANK TANK SIZE MINIMUM LOCATION of SOIL MINIMUM NUMBER <br /> # (Gallons) NUMBER of SAMPLES of WATER SAMPLES <br /> SOIL SAMPLES <br /> < 10,000 From wall next to tank <br /> Single Tank 2 ends at soil/ 1 <br /> groundwater interface <br /> > 10,000 OR From wall next to tank <br /> Tank Cluster 4 ends at soil/ 1 <br /> oundwater interface <br /> SLAB PRESENT IN THE TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will <br /> be required in order to collect the samples. (Physical removal of the obstruction will allow sampling according <br /> to the above conditions.) <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> < 1,000 3 per Tank Center and Ends OR Sides of Tank <br /> 1,000- 10,000 5 per Tank Center and Ends OR Sides of Tank <br /> > 10,000 5 OR More per Tank Ends and Middle and generally spaced <br /> along the length of the Tank <br /> EH 23 047(Rev 7/10/92) <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.