Laserfiche WebLink
05/19/2008 16:19 2093651543 <br />D. Results ofTesil'ing/Servicing 0 <br />Software Version Installed; <br />g2MPjge the following checkhm. <br />Ye 0 No* Is the audible alarm operas <br />Q No* is the visual alatrn epdrati( <br />es Q No* IWere all sensors visual i; <br />TANKNOLOGY PAGE 07 <br />e5 <br />G No*'Were <br />a]I sensors installed at lowest point of secondary containment and positioned so that other eq <br />ipment will <br />not interfere with their' ro er Operation? <br />Q Yes <br />0 NO <br />lT alarms art relayed to a remote monitoring station, is all communications equipment (e._, <br />modem) <br />/A <br />operational? <br />CI Yes <br />C1 <br />]=or pressurized pipini, systems, does the turbine automatically shut down if the piping secondaryontainment <br />N(A <br />j ttto»itoring system detCctS a leak, fails to operate, or is electrically disconnected? If yes; which senors <br />initiate <br />positive shut-dovrlt? (Check all:haf apply) ❑ Sump/Trench Sensors; © Dispenser Containment Se <br />sots, <br />Jaid you conflnn ositive shut -down due to leaks and sensor failure/disconnection? ©Yes; D No. <br />M YesCIN <br />� <br />Tor tank systems that', utilize the monitoring system as the primary tank overfill. warning device <br />(i,e. no <br />/A <br />t hanical overfill prevention valve is installed), is the overfill warning alarm visible and audible <br />at the tank <br />fill oint s and o erad'9 ro erl ? If so, at what percent of tank ca aci does the alarm trigger? <br />© Yes* <br />No <br />Wps any monitoring equipment replaced? I'f yes, identify specific sensors, probes, or other cquipme <br />t replaced <br />nd list the manufacturer name and model for all replacement parts in Section E, below. <br />0 -yes" <br />o�'Vas,.,liquid <br />found insidb any secondary contai.rnrment systems designed as dry systems? (Check all rh <br />r apply) El <br />'rodaer 0 Water.If es describe causes in Section E, below. <br />l7 Y <br />No* <br />Was monitorin s steinset-u zeviewed to ensure ro er settin s? Attach set u re arts, iia liable <br />Yes <br />O Na* <br />I i all monitoring a u ent operational per manufacturer's s ecifications? <br />J <br />* In Section <br />L below, <br />describe how and whin these deficiencies were or will be corrected. <br />E. Comments: <br />Page 2 or 1 03/01 <br />