My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 10:56:18 AM
Creation date
6/3/2020 9:56:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order: 2257079 • . <br /> P. In-Tank Gauging/SIR Equipment: 0 Check this box if tank gauging is used o:i!y ibr i.tlentor;;Otitrni. <br /> ❑ Check itis box if no tank gauging-or SIR equiesl,Cnt:S irrs[ailz�. <br /> This section must tie aotnpleted if in-tank gauging equipment is used to perform leak dett:Clioll tnonitorfnv, <br /> Cum tete the followin checklist: <br /> LOS ❑ '40* Has all input wiring <br /> __ p 6 been inspected for proper entry and termination,including testing lar,ground faults'.' <br /> 1 ❑ 'res ! J Vito' r"ei u all tank gauging probes visually inspected for aalnage and residue buildup? <br /> f ❑ Yc: ❑ Ise" %"as accuracy of system product levet readings tested? <br /> �Yes i ❑ A10 of system water leveI readings tested. <br /> J Yes El No" ! Wtre al:probes trinstalled properiv? <br /> U ❑ No* ?fere all items on the equipment inanufacturttr's matntenance checklist completed? <br /> .In the Section Ii,belaiv,describe how and:�Clxksthir <br /> thee efficiencies were or will be corrected. -J <br /> G. Line beak Detectors(LLD): box if LLDs are not installed. <br /> _Can lett the folIowln eltecklist: <br /> II^ D��r eguiptncnt gra -up or annual equipment ccrtifxatioleak simtelatec± w verify L!,D perinrtnance? <br /> D N.:'A i K-heck tail ilral apply)>1 Simulated leak rate: ❑ h,; ❑ <br /> JJ YJ 3 g.p. O.i e,p.h; .0 Q.2 g,p.1) <br /> ❑ Ys t U tio" ! crcre Al.U Ds confirmed operation?and accurate within regulatory requirements? �I <br /> i <br /> U Yes_ 13 No* j �i'as the;ustint;appatants properly calibrated? <br /> :. U Yes I > No" t:r rnechanica!UDs,does the LLD restrict product flow if it dotects a kak'' <br /> ❑ N.'.A _I. <br /> ❑ Yes J, N'o'r FC(;r cJectronic LLDs,does the turhi;te aulo tl3I—ity shut off if the LLD detects a Icak? j <br /> I' U Yes ❑ Nle* ' Pnr electronic LLDs,does the turbine atrtotnarically shut off if any porion of tic ntnnitorin� rsrem is disabled <br /> ❑ IMA I or disconnecred? I� <br /> ❑ Yrs U No* i For electronic LLDs,does the turbine autotnatical!y shut offif any of the monitoring system malfunctira; i <br /> ❑ 1�•:A as 1'x:13 a test? �I <br /> 7 Yes ❑ No" ; Fo'elccn-onic LLDs,have all accessi 5)e:?firing connections been visual!y inspected? <br /> .t ❑ �'" ❑ NO • 'h'erc all Arms on the equipment manafactwer`s maintenance checklist completed? <br /> In the Section 11,Wow,describe how and whets these dertriencies were or will be corrected. <br /> II. Cointnents: <br /> P2gr•3 of 3 <br /> 03+G] <br /> Tanknology Inc. 8501 N.MoPac Expressway,Suite 400,Austin,Texas 78759 <br />
The URL can be used to link to this page
Your browser does not support the video tag.