Laserfiche WebLink
Monitoring System Certification <br />UST Monitoring Site Plan <br />Site Address: 1403 COUNTRY CLUB BLVD, STOCKTON CA 95204 <br />. . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . IAFA CTC ^11• TA\1W ^L11 v <br />. . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . <br />VAPOR . <br />. . . . <br />. . . . <br />.©. <br />. . . . . . . . <br />. . . . . . . . <br />.ANNULAR. <br />. . . . <br />. . . . <br />. <br />. <br />. . . . . . . <br />. . . . . . . <br />, MONITOR, <br />. . . . . <br />. . . . . <br />. . . . . <br />. . . . . . . <br />. . . . . . . <br />. . . . . . . <br />_ ,PIPING . <br />. . . <br />. . . <br />. . . <br />.�. <br />. . . . . . . . . . . . FILL. <br />.0. . <br />. . . TURBINE. <br />. O. . <br />. . . . VENT. <br />0 . . . <br />. . . . ATG <br />. <br />Date map was drawn: 06/ 26/_09. <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On <br />your site plan, show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control <br />panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line <br />leak detectors; and in -tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification <br />Page 4 of 4 <br />1 <br />12/07 <br />2/21/07 <br />