Laserfiche WebLink
OPW NO. 1-2100 SERIES GRADE <br />LEVEL SPILL CONTAINER <br />INSTALLATION INSTRUCTIONS: <br />Stepl. <br />Per California SB -989, all metal must be protected <br />from direct contact with the elements. Coat stainless <br />steel band clamps with the following approved <br />coatings. OPW SL -1100, 3M Underseal 08883 or <br />Polyguard Mastic CA -9. Only the threaded <br />hardware needs to be coated in the field. <br />Step 2: (See Figure 1 & 2) <br />Set riser pipe. "L" is the distance between the top of <br />the riser pipe and finish grade. <br />Note: The "L" dimensions below factors in a <br />I" slope to grade. <br />Model Series <br />"L" Dimension <br />1-2100, 5 Gal. (Comp. Base) <br />L=15 5/8" (40cm) <br />1-2100E, 7.5 Gal.(Comp. Base) <br />L=19 5/8" (50cm) <br />1-2115, 15 Gal. (Comp. Base) <br />L=19 5/8" (50cm) <br />1-2100C, 5 Gal.(Cast Iron Base) <br />L=14 1/2" <br />(37cm) <br />1-2100EC, 7.5 Gal -(Cast Iron Base) L=181/2" <br />(47cm ) <br />1-2115C, 15 Gal. (Cast Iron Base) <br />L=18 1/2" <br />(47cm) <br />Note: <br />If using OPW FSA -400, add 3-1/4" to Dimension "L". <br />If using OPW FSA -400-S, add 1-3/4 to Dimension <br />"L„ <br />NOTE: FSA -400-S will only work with Cast Iron <br />Base. <br />Step 3: <br />Deburr and thoroughly clean riser pipe. Apply pipe <br />dope to riser threads. Pipe dope to be a non - <br />hardening, gasoline resistant pipe thread seal <br />compound. <br />Step 4: <br />Install OPW FSA -400 Face Seal Adapter onto riser <br />using the OPW 61 SA -TOOL. Torque to 125 ft -lbs <br />min. to 250 ft -lbs max.( 4" NPT). Apply pipe dope to <br />FSA -400. Pipe dope to be a non -hardening, <br />gasoline resistant pipe thread seal compound. <br />Step 5: <br />Install spill container by rotating the mounting ring <br />until hand tight. <br />NOTE: Do not attempt to completely tighten the <br />container by using the mounting ring <br />Step 6: <br />Finish tightening the spill container with the OPW <br />61 SA -TOOL. Torque to 125 ft -lbs min. to 250 ft. <br />Ll <br />Lbs. max. (4" NPT) <br />Step 7: (See Figure 2) <br />Apply pipe dope to nipple and install. Pipe dope to <br />be a non -hardening, gasoline resistant pipe thread <br />seal compound. Use only factory made nipples. <br />Nipples must be cut square and deburred. Torque <br />to 125 ft -lbs min. to 250 ft -lbs max. (4" NPT). <br />Torque value is based on rotation at the center of <br />pipe. For standard cover models install adaptor and <br />dust cap. For sealable cover (1 SC) models, install a <br />standard 4" pipe cap to support adjustment system. <br />(Adaptor and dust cap must be installed in sealable <br />cover (SC) models after concrete has dried. <br />Note: Nipple length is determined by measuring <br />from the bottom of the threaded portion of the base <br />to the bottom of the cover. Then subtract 2" for <br />clearance, height of adaptor and height of cap. <br />Range of nipple lengths that can be used in all of the <br />OPW spill containers: 4" minimum to 14" <br />maximum. <br />re i <br />Finish Grade <br />Finish Grade Slope 1" min. <br />CONCRE-F <br />DR 1 VE p <br />•da � °a ' a � <br />Dust Cap <br />Adaptor <br />Bottom of <br />thread in base <br />Top of Riser Pipe <br />Pipe <br />