Laserfiche WebLink
9257899 Line 1 01630 p.m. 11-10-2010 7/8 <br /> 0 <br /> s <br /> LA�RCHIT-ECT.URE • ENGINEERING + ENv1RoNMENTAX. .SERVICb-S <br /> GROUP INC. 11.37 North AlcDowolt 80aierard, Pelalnnta, CA 94954.1114 Telephone: (707)765-1660 p�etirnilr; (707) 76S4908 <br /> John IV.Johnson,Arrltireet S i F a b l L t h e d 1 9 6'6 <br /> JOkIN W.JOHNSON S <br /> co-preside"I j <br /> Priuripal <br /> ;I <br /> February 13,2001 REVISED July 17,,2001 <br /> BRIAN F. 7_1 TA S.Bravo Systems,Inc. <br /> cp.P,rsiJerrt <br /> 2.929 Vail Avenue i <br /> P e i n e ip a l Commerce,CA 90:040 <br /> ,ATT: Don Mukai;P.E. <br /> a N N r). w I, RE: THIRD PARTY APPROVAL <br /> vire president CCRTitle.23,Division 3,Chapter 16 Sections.2631(d)and 2630) <br /> Prrnripat <br /> BRAVO UL EPDXY COATED STAINLESS STEEL CLAMP <br /> CALIFORNIA WATER-RESOURCES CONTROL BOARD LETTER: <br /> CrctL R. Spr.Ncr.it DATED 11/14/00 TO ALL LOCAL AGENCY UNDERGROUND STORAGE <br /> Vic Persirlrnt <br /> TANK PROGRAM MANAGERS AND CUPAS <br /> Principal <br /> I have examined.and reviewed the following items on the Bravo protected steel,clamps for <br /> use on boot:systems:used on buried petroleum product lines: <br /> c 11 x i s I.A u N 1. Bravo UL.Epoxy Coated Stainless Steel Clamps. <br /> Regional Manager <br /> r1 s s o r i a r c 2. Data on stainless Steel worm clamps. . <br /> -3. Appendix#6B UL test reports on steel coating. <br /> JAMES s. r,L E r T E N 4. Appendix#8 Product information on Vulkem 116 Polyurethane Sealant,. <br /> ;I <br /> Regionat Manager <br /> A r r o c i a r e 5. Bravo.installation instructions. i <br /> Upon review of the manufacturing procedures and the em .lo <br /> p yment ofthe materials used in <br /> the construatign.and installation of the Bravo UL Epoxy Coated stainless Steel Clamp <br /> System,it my opinion and conclusion that sound engineering design and.engineering of <br /> C A R.Y M. s E A,L,N c <br /> Regional Manager this product will provide isolation of the clamp from the backfill in buried lines,.: <br /> dsiariatr '" � <br /> The review and conclusion were made in accordance with the requirements Of Sections <br /> 263:1(d)_and,2636(b)listed above. <br /> OEFSSJp,1j <br /> ALAN K. SiI1MA0uk;on0 <br /> 6 <br /> Regional Alanager + ' <br /> Assoriate � <br /> ?Imnes ,Ray vvv Iiia;24,518 j <br /> Sr.Civil Engineer .e 6U Iz 3i�41 <br /> F OF <br /> BLYTIIE R. WILSON <br /> Regional Managrr RimuVuE, WA LA HAIIRA, CA MARTINEZ. CA PETAWMA, CA. <br /> elr3oriorr SACkAMENTO, CA $COTTSDAI.Ii, AZ VANCOUVER.WA <br />