My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2011-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 11:55:25 AM
Creation date
6/3/2020 9:56:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2012
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_2011-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" WUNIFIED PROGRAM CONSOLIDATED FORNW <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Pae 1 of 2) <br /> TYPE OF ACTION <br /> ❑1.NEW PLAN 2.CHANGE OF INFORMATION E ` 49r <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. _ ` ;'4 <br /> (Check one item only) K 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)-Gas Station UST's <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) _ t <br /> BUSINESS NAME(Same as FACILITY NAME) C R L L C / # 5446 3. <br /> BUSINESS SITE ADDRESS 1 4 0 3 Country Club Blvd . 103' CITY S t o c k t o n <br /> IL EQUIPMENT TEST'ING AND PREVENTIVE MAINTENANCE NT <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> (23 CCR§2632,2634,2638,_2641 <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY 490-3a. ( ecAA <br /> 490-3b <br /> III.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. I3 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)4904 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD($)t <br /> Q 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490.6 <br /> -------------------- ------------------------------------------------------------------------------------------------------------------------------------ <br /> 490.8 <br /> PANEL MANUFACTURER: V @ @ d @ r Root 490-7. MODEL#: TLS-350,w/ISD <br /> LEAK SENSOR MANUFACTURER: Veeder Root 4919. ; MODEL#(S): 3 0 2 490-10 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> ------------------------------ --------- ------------------------------------------------------------ <br /> IN-TANK PROBE MANUFACTURER: 490-14._ MODEL#(S)_ 490-15- _ <br /> ------------------------------------------------------- <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS -•--------_________-_________-__ <br /> Q ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-I6 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> -- -- -- - - -- ----------- <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHERS(Specify): <br /> 490.18 <br /> g.p.h. g.p.h. ( Pe fy): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: Ela.36 HOURS 171b.60 HOURS 490-21 <br /> 490-22 <br /> ® 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: © a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-24 <br /> 49125 <br /> ❑99.OTHER (Specify): 490-26 <br /> 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> ❑■ 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:Ea.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> PANEL MANUFACTURER: V e e d e r Root_ - _-� 490-30;MODEL#: TLS-350w/ISD -- 490-31 <br /> -- 490--32� � <br /> --LEAK SENSOR MANUFACTURER: Veeder Root -- #(S): 2 0 8 490-33 <br /> - ------------------------------------- - - --------------------- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑a.YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-35 <br /> ❑■ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> _ PRODUCT FLOW WHEN A LEAK IS DETECTED(23_CCR 32636) - _ - - __- - - - --- - - 490-36 <br /> MLLD MANUFACTURER(S): VMI 490-37 MODEL#(S): L D-2 0 0 0 490-38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ELLD MANUFACTURERS 490 40' 49041 <br /> --------------------------�)----------------------------------------------------------f MODEL#(S):----------- <br /> - -- ---------------------- ------------ <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. a9o4z <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490.44 <br /> ■ 4.PIPE INTEGRITY TESTING 490-45 <br /> TEST FREQUENCY ® a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 49046490.47 <br /> ❑ 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49 <br /> "Allowed for monitoring of unburied emergency enerator fuel piping only per HSC§25281.5(b)(3) ' <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§2636(a)(3)]. 490-s0 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ 99.OTHER(Specify) 490-11 <br /> 490-53 <br /> F Mm <br />
The URL can be used to link to this page
Your browser does not support the video tag.