My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2011-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 11:55:25 AM
Creation date
6/3/2020 9:56:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2012
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_2011-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br />Hi Allen, <br />I've reviewed the UST package sent to me June 7 and need to receive the following information: <br />1. The "Letter from Chief Financial Officer" does not have a large enough "tangible net worth". Line 4 must be <br />$100,000 minimum to use this financial responsibility mechanism. See the attached document. <br />2. The 87 product secondary pipe repaired and tested 11-18-10 needed six month follow up testing by 5-18- <br />11 pursuant to Title 23 California Code Regulations section 2637. This testing is overdue. Schedule this <br />testing and send testing notification to this department. <br />3. The diesel and 91 product turbine sumps were due for secondary containment testing on October 2010. <br />This testing is overdue. Schedule this testing and send testing notification to this department. <br />4. 1 approved the UST response plan. A copy is attached. Please send a copy to the facility. <br />5. The designated operator violation 23c was not addressed in your return to compliance package. <br />6. 1 did not receive the underground waste oil tank monitoring plan. Prepare this plan and send to me. <br />7. The fuel monitoring plan has several errors. Fix and return to me. See the attached, highlighted plan: <br />a. The tanks annular spaces are liquid filled, not dry. <br />b. Tank integrity testing is not required. If you decide to do this testing, send me the test results and <br />notify us of the test date. <br />c. The facility is setup to trigger automatic pump shutdown for piping leaks and panel failure. <br />d. Pipe integrity testing is not required. If you decide to do this testing, send me the test results and <br />notify us of the test date. <br />e. Include the overfill prevention method in the Comments section: Currently, the system overfill <br />prevention is "Mechanical flapper valves set at 95% of the tank capacity." <br />f. The Personnel Responsibilities section must list the people (not company) who are responsible for <br />the daily monitoring and maintenance of the underground tank system. Do not list contractors who <br />respond to maintenance calls or do spill response. <br />Garrett Backus <br />Senior Registered Environmental Health Specialist <br />San Joaquin County Environmental Health Department <br />600 E Main Street, Stockton CA 95202-3029 <br />telephone: (209) 468-2986 <br />fax: (209) 468-3433 <br />email: gbackus@sjcehd.com <br />htt�//www,s; ov.ore/ehd/Programs/Others/unifed.htm <br />8/5/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.