Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 1 of 2) <br /> TYPE OF ACTION ❑ I.NEW PLAN ® 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ® 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): Gas Station USTS <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1. <br /> BUSINESS NAME(Same as Facility Name or DBA) 3 <br /> CRLLC/76#5446 <br /> BUSINESS SITE ADDRESS 1403 COUNTRY CLUB BLVD 103' CITY STOCKTON 104. <br /> II. EQUIPMENTTESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions,or annual( ,whichever is more frequent.Such work must be performed by qualified personnel.[23 CCR§2632,2634,2639,26411 <br /> EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER490-3. <br /> MONITORING E <br /> Q (Specify): 490-36. <br /> IH. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634] 4904. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) 'aleck all <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490.6. <br /> PANEL MANUFACTURER: Veeder Root 490-7' MODEL#: TLS-350 W/ISD 496-8. <br /> LEAK SENSOR_MANUFACTURER: Veeder Root 490-9' MODEL#(S): 302 490-10. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§26431 490-11. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-I6. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHERS if ago-18. <br /> g.p.h. g•P• (Specify): a90-l9. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.11 490-20. <br /> El4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§26451 TESTING PERIOD: [:] a.36 HOURS [:1b.60 HOURS 19121. <br /> _ 190-22. <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.q 490-23. <br /> TEST FREQUENCY: ® a.ANNUALLY E] b.BIENNIALLY ❑ c.OTHERif 490-24. <br /> (SPeC�Y)� a90-zs. <br /> -- 490-26. <br /> ❑ <br /> 99.OTHER(Specify): 490-27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) '1 <br /> atakll) <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490.28. <br /> [23 CCR SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-29. <br /> §26361 <br /> PANEL MANUFACTURER:Veeder Root 490-30. MODEL#: TLS-350 W/ISD 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-32. MODEL#(S): 208 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. in a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-35. <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§26361 <br /> MLLD MANUFACTURER(S): Vapor'1 e S S 491-37. MODEL#(S): 9 9 LD2 0 0 0 490-38. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§26361 490.39. <br /> ELLD MANUFACTURER(S): 49040. MODEL#(S): 490.41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49143. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. [I a.YES ❑ b.NO 49144. <br /> ❑ 4.PIPE INTEGRITY TESTING. 49045. <br /> TEST FREQUENCY: a.ANNUALLY C1b.EVERY 3 YEARS E] c.OTHER(Specify) 490449046. <br /> ❑ 5.VISUAL PIPE MONITORING, 49048. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY c'MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049. <br /> Allowed for 'ngof unburied emergency generator fuel i in onl HSC L25281.5(b 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(.)(3)1 490-50. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> 490-52. <br /> ❑ <br /> 99.OTHER(Specify) 490-53. <br /> UPCF UST-13(12/2007)-1/3 www.unidocs.org <br />