Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAY (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490.541 <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54b <br /> 19 4 NO DISPENSERS99.OTHER(Specify): <br /> PANE/.MANUFACTURER—❑: 49455 ( MODEL#: 490-56. <br /> LEAK SENSOR MANUFACTURER: 490 57 ; MODEL#(S): 49454 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS <br /> ❑ a.YES ❑b.NO 49459 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑b.NO 490'60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Cl a.YES ❑b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑ a.YES ❑b.NO 490.62 <br /> 2.UDC CONSTRUCTION IS ❑I.SINGLE-WALLED ❑2.DOUBLE-WALLED 490.63 <br /> IF DOUBLE WALLED: i90 6t1 <br /> —_UDC INTERSTITIAL SPACE IS MONITORED BY:: f 1,LIQUID 02.PRESSURE ED 3.VACUUM <br /> - ----- 0.641 <br /> A LEAK W[TH[N THE SECONDARY CONTAINMENT OF THE UDC'TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.--YES--------b <br /> ❑b.--NU-------4-99°-64b <br /> VII.PERIODIC SYSTEM TESTING <br /> I. ELD TESTING:THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490.65. <br /> __LEAK DETECTION(ELD)MUST BE PERFORMED- PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS RE_QUlRF-),AL CCR X264 .111 <br /> [12.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERT'36 MONTHS 490.66 <br /> -9999-1EC — -� —-- <br /> • 3.SPILL BUCKETS ARF,TESTED ANNUALLY. <br /> 490.67 <br /> VIII.RECORDKEEPING <br /> The following mon itoring/maintenance records are kept for this facility: <br /> El Alarm logs 490-63. (D Visual Inspection Records 490.69b ❑'rank integrity testing results 494686 <br /> ❑SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 490.6se <br /> ❑ATG Testing results(and supporting documentation records).49o.68r ❑ Corrosion Protection 60-day logs 490-69a <br /> Equipment maintenance and calibration records. 49o-6ab <br /> 1X.TRAINING . <br /> Q Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-691 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> El THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490591 <br /> Q OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-696 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD(SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69r <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-698 <br /> ❑ OTHER(Specify):M69h,M69i <br /> IN This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC) <br /> I The"Dee;gnatcd UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire,This <br /> training will include,but is not limited to,the following: <br /> Y Operation of the UST systems in a manner consistent with the facility's best management practices <br /> The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> Y The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> i Names of contact person(s)for emergencies and monitoring alarms.490.70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan 490-7! <br /> The waste oil tank has an overfill liquid sensor which triggers an audible/visual alarm on the Ronan monitoring panel when the tank is 90%full. <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the dailviroutine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release arc investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance <br /> NAME Allen Faass 490.72 TITLE Tank and Pump Maintenace 490.73 <br /> NAME Allen Faass 490.74 'TITLE Testing 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XIL OWNERIOPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 490-76 DATE: 490.77 <br /> SEtiT/NG•❑1 lank Ovvnm'Ooew�r❑ Facility t),srar/0ee 0-r ❑3 AuaSarized Rearesentative of Owner <br /> APPLICANT NAME(print): 4fl0'75 APPLICANT TITLE: 4W79 <br /> Allen Faass Compliance <br /> L'PCF ISTD(12/2007)3/4 y <br /> ( " <br /> i <br />