Laserfiche WebLink
MONITORING SYSTEM CERTIOCATION <br />CERTIFICATION / TEST DATE: June 5, 2012 <br />A1. FACILITY A2. OWNER <br />Name CRLLC #2705446 Name Pacific Convenience and Fuels, LLC <br />Address 1403 Country Club Blvd., Stockton, CA 95204 Address 7108 Koll Center Pkwy, Ste 100, Pleasanton, CA 94566 <br />Phone # 209-943-2082 Phone # 925-884-0827 <br />Contact Roger Fernandez Contact Tony Grossi <br />IF. IN -TANK GAUGING / SIR EQUIPMENT: <br />❑ Check this box if tank gauging Is used only for Inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ <br />Yes <br />❑ <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. LINE LEAK DETECTORS (LLD): ❑ Check this box If LLDs are not Installed. <br />Complete the following checklist: <br />❑ <br />Yes <br />❑ <br />No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ <br />N/A <br />(check all that apply) Simulated leak rate: ■ 3 g. p. h.; ❑ 0.1 g. p. h.; ❑ 0.2 g. p. h. <br />❑ <br />Yes <br />❑ <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />❑ <br />Yes <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />❑ <br />Yes <br />❑ <br />No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />N/A <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ <br />N/A <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ <br />N/A <br />or disconnected? <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />❑ <br />N/A <br />or fails a test? <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ <br />N/A <br />❑ <br />Yes <br />❑ <br />No* <br />Were all Items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />IH. COMMENTS <br />Page 3 of 3 <br />