My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2013-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 1:49:12 PM
Creation date
6/3/2020 9:56:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2017
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_2013-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />v <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES W NO [ ] <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />.adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />Upon completion of Helium investigation, we have determined the diesel secondary is leaking near <br />Disp #1-2 we will attempt to make repairs inside the UDC, if failure point can not be accessed, then <br />we will break out concrete adjacent to Disp #1&2 to make repair. <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />Bravo Re»air Fitting <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.