Laserfiche WebLink
T -T <br />L A Ilk C 1-1 1 'r E C T U R IT - ENGIN 1: 1- It IN G - E N \1 I R 0 N M F N 1- A L S ERV I C F S <br />(';Roll)' INC. i) 1, N-0, .11,1) 1; f -I If Io Tel,ph-,e: (7(17) ?65-166:0 765-9908 <br />joh" 11 jofr.?r.- 1: s i a I, l i r k e .1 1 9 6 6 <br />I I NV. I I I N "ON <br />Co Id -11 <br />February 13, 2001 REVISED July 17, 2001 <br />S. Bravo Systems, Inc. <br />2929 Vail Avenue <br />Commerce, CA 90040 <br />ATT: Don Mukai, P.E. <br />RE: THIRD PARTY APPROVAL <br />CCR Title 23, Division 3, Chapter 16 Sections. 2631(d) and 2636(b) <br />BRAVO FLEX BOOT SYSTEM UTILIZING ADHESIVE FRP PIPE <br />SYSTEM AND UL EPDXY COATED STAINLESS STEEL HOSE CLAMPS <br />WITH ISOLATION SEALANT SYSTEM. <br />CALIFORNIA WATER RESOURCES CONTROL BOARD LETTER <br />DATED 11114100 TO ALL LOCAL AGENCY UNDERGROUN STORAGE <br />TANK PROGRAM MANAGERS AND CUPAS <br />I have examined and reviewed the following items on the Bravo protected steel clamps for <br />use on boot systems used on buried petroleum product lines: <br />The original Bravo Flex Boot System was third party approved by RBL Design on April 15, <br />1.999. All materials approved in that approval are still valid with the exception of the <br />modifications to provide isolation from the soil for the hose clamps and a method of <br />bonding the flex boot directly to FRP pipe. <br />I. Bravo UL Epoxy Coated Stainless Steel Clamps. <br />Regroaa! <br />2. Appendix #613 UL test reports on steel coating. <br />3. Appendix #8 Product information on Vulkern 116 Polyurethane Sealant. <br />G, A if V "'I I M I 1'V 4. Bravo installation instructions for clamp system installation, <br />I S iA j <br />5. Original Third Party approval letter and data on the Bravo Secondary Flex boot <br />system dated April 15, 1999. <br />6. Chemical Exposure Test on S Bravo Systems' Flex Boot with FRP Pipe. Tested <br />A I K. ',;I I \I S if I, c, with both Arneron and A.O. Smith FRP bonded to Bravo Flex Boot. Test Report <br />date 1/31/2001, <br />7. National Technical Systems Fullerton Division Test Report Number 176-0728. <br />Test for Pressure Cycling and Burst. This test evaluated both the hose clamp <br />system and the direct bonding of the boot to FRP pipe and the boot itself. <br />It I % I!j I K W'! <br />111; 1, 1 1: v I-) ii. WA 1. A I I.% it it ',. CA %-I A K I I N I CA PE I A I Q NA A, C A <br />V A N C 0 IT V E It <br />S� A k- If A M f� NT, 1, C A S i I � I I A I I I. A WA <br />