Laserfiche WebLink
AQUiN <br />SAN .JOAQUIN COUNTY <br />e �{ <br />*ENVIRONMENTAL HEALTH DEPARTMEN <br />MI <br />1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br />P.. Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.si oq v_ora/ehd <br />A�1Fo <br />• it • ' I'M• .1 1j !� • , . • <br />Facility Name: <br />Inspection Date: <br />❑ <br />❑ mechanical Model: <br />Facility Address: <br />THIS.FACILITY IS SUBJECT TO iiniii-11,11111Aii �. 1 <br />Service R quest #: <br />❑ <br />Leak detector <br />❑ <br />Onsite Service Technician's <br />ame:ICC <br />Service-Technician/installer Exp. Date: <br />Manufacturer Training: <br />/`{ <br />-- <br />❑ <br />SERVICE <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />THIS.FACILITY IS SUBJECT TO iiniii-11,11111Aii �. 1 <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />This UST facility is APPROVED to operate <br />SERVICE <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />THIS.FACILITY IS SUBJECT TO iiniii-11,11111Aii �. 1 <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 20 containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />Other: see below <br />• ...:• is • - •- <br />EHD 23- <br />/ <br />Rev 4/30/12 <br />UST SERVICE REQUEST INSPECTION REPORT <br />' f �. <br />PITMAN <br />THIS.FACILITY IS SUBJECT TO iiniii-11,11111Aii �. 1 <br />�Iff <br />. <br />rl1 %lid. <br />�VIA <br />111 11111 <br />;. <br />� <br />EHD 23- <br />/ <br />Rev 4/30/12 <br />UST SERVICE REQUEST INSPECTION REPORT <br />