My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_1999-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 10:42:38 AM
Creation date
6/3/2020 9:56:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2010
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232224_3250 W HAMMER_1999-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AM <br /> SAN JOAQU i COUNTY ENVIRONMENTAL REALTIJIVPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - PAGE 1 <br /> MOI. <br /> TYPE OF ACTION (� 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Mot. <br /> PLAN TYPE MONITORING IS <br /> IDENTICALR ALL USTs AT THIS FACILITY. <br /> (Check one item only} El PLAN COVFOLLOWING UST SYSTEM(S): <br /> ACILITYINFO TION <br /> FACILITY ID#(Agency Use Only) Moa <br /> FACILITY NAME Moa CITY Mos. <br /> FA17 <br /> CILITY SITE ADDRESS F <br /> NTENANCE <br /> IL EQUIPMENT TESTING AND PREVENTIVE ) p Mob. <br /> State iaw requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc. p ernnel. in <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. M07. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY 99.OTHER(Specify): <br /> ❑ <br /> IIL'MONITORING LOCATIONS <br /> eifbi�ed(i.e location of each sensor, <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts urrent UST Monitoring Site Plan an t e locations where monitoring is from a Monitoring System Certification <br /> i <br /> line leak detector,monitoring system control panel,etc.). 1f you already have diagram n,e.g.,include it with this <br /> form,Hazardous Materials Business Plan map,etc. which shows all required <br /> information, nIan. <br /> IV. TANK MONITORING M10. <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) Mit. <br /> c.UNDER PRESSURE ❑ d.UNDER VACUUM <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ M12 M13. <br /> MODEL#: A <br /> PANEL MANUFACTURER: Mts. <br /> Mla. MODEL#(S): <br /> LEAK SENSOR MANUFACTURER: <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANtK� MODEL#: M17 <br /> PANEL MANUFACTURER: MIS MODEL#(S): M19. <br /> IN-TANK PROBE MANUFACTURER: c.WEEKLY M20 <br /> ❑ ❑ <br /> LEAK TEST FREQUENCY: El a. DAILY/NIGHTLY M21 a.CONTINUOUS ® e.OTHER(Specify): <br /> C1 d.MONTHLY M22. M23. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. [❑ c.OTHER(Specify): M24. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 <br /> [1 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 ❑ b.60 HOURS M25. <br /> TESTING PERIOD: E] a.36 HOURS <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 X426, M27, <br /> TEST FREQUENCY: ❑ a.ANNUALLY El b.BIENNIALLY ❑ c.OTHER(Specify): <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ <br /> b.WEEKLY(Requires agency approval) M29 <br /> ❑ 99.OTHER(Specify): <br /> V. PIPE MONITORING M30. <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S){Check all that apply) <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMPS)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT M31 <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ M". MODER PRESSURE ❑ d.UNDER VACUUM M33. <br /> MODEL#: <br /> PANEL MANUFACTURER: Mas. <br /> Mia. MODEL#(S): <br /> LEAK SENSOR MANUFACTURER: M36. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ® a.YES ❑ b.NO <br /> M37. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATC LEAK TESTS SHUTDOWN? <br /> ©RIOTS ® SHUTS OFF <br /> 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. M3F <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED M31. MODEL#{S): <br /> MLLD MANUFACTURER(s): <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS M41. <br /> Mao. MODEL#: <br /> ELLD MANUFACTURER: M42. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL a.YES ❑ b.NO M43' <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO Mao. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? <br /> ❑ 4.INTEGRITY TESTINGM45 M46. <br /> a.ANNUALLY ❑ b.EVERY 3 YEARS E] c.OTHER(Specify) <br /> TEST FREQUENCY: ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED"" M47. <br /> Requires agency approval <br /> ❑ $.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY* ❑""Allowed for monitoring ofunburied emergency generator fuel piping only per HSC§25251.5(b)(3) <br /> " <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) Mos <br /> ❑ 99.OTHER(Specify} 07/23/03 <br /> SJCEHD-d(07/03)-1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.