My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_1999-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 10:42:38 AM
Creation date
6/3/2020 9:56:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2010
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232224_3250 W HAMMER_1999-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7AT <br />TAIT & ASSOCIATES, INC. <br />CONSULTING ENGINEERS <br />December 29, 1999 <br />Civil • Planning • Surveying • Environmental <br />Via: Overnight <br />Mr. Michael Kith <br />San Joaquin County <br />Department of Environmental Health <br />304 East Weber Avenue, Third Floor <br />Stockton, CA 95202 <br />Phone (209) 468-3446 <br />�'� � T-;;�4. rw <br />a .`� <br />RE: ARCO AM -PM <br />s <br />3250 West Hammer Lane <br />Stockton, CA 95209 <br />- <br />TAIT Job # AR 896A <br />E N Vi R 0 INI Kf1i E `,L i LTH <br />PERM 1T <br />Dear Michael: <br />Please find this response to your request for additional information in your letter dated <br />December 27, 1999. <br />1. Overfill container is Pomeco with the spill containment buckets integral to the lid <br />of the cover. The application has been revised and is included. Additionally <br />sheet TK4-3 has been changed to reflect this. The cut sheet, which was sent in <br />the original submittal would be the one, installed. <br />2. Site specific piping is shown on sheet TK -1. Sheets TK3-1 and TK3-2 are <br />schematic in nature. These have been revised for your review as well. <br />3. The cut sheet for the low point sump is included. The condensate trap does not <br />have a cut sheet. This trap is made up in the field. An example of this devise is <br />located at 6100 North Highway 99, which was approved by SJEH in August of <br />1999. <br />4. Detail sheets for the flex boots included. <br />5. Dispenser sump cut sheet included. <br />Construction is scheduled for this site on 1/3/00. Please contact me in the event that the <br />installation portion of this permit is not approved by that date. Thank you for your help and <br />let me know if you need any additional information. <br />Respectfully, <br />TAIT & Associates, Inc. <br />Tim Page <br />Project Manager <br />// health3-mk <br />2880 Sunrise Boulevard • Suite 206 • Rancho Cordova, CA 95742 (916) 635-2444 • (916) 635-2606 FAX <br />Other Locations: Orange, CA • San Diego, CA • Concord, CA Phoenix, AZ • Tucson, AZ <br />Established 1964 <br />
The URL can be used to link to this page
Your browser does not support the video tag.