Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54 <br /> 490-546b <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS EJ99_OTHER(Specify): —----------------- - -------------------------------------------------- <br /> 490-55 <br /> - - ------------- — - -- - <br /> PANEL MANUFACTURER: MODEL#: 490-56. <br /> ---------------------------------------------------------------------------- -------------------------------------- <br /> LEAK SENSOR MANUFACTURER: ago-s7 1 MODEL#(S): 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUBVIBLE AND VISUAL ALARMS ❑ a.YES b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ®b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a.YES ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS ❑1.SINGLE-WALLED ❑2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: 490-640- <br /> -UDC INTERSTITIAL SPACE IS MONITORED BY:_[]1.LIQUID [12.PRESSURE ❑3 VACUUM — ------------------------------ <br /> — ----------- <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490-64b <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED X23 CCR$2644.1 <br /> [�2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS.--- ---------- -- - - - 490.66 <br /> L <br /> 3 SPILBUCKETS ARE TESTED ANNUALLY 49x67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> ❑Alarm logs 490-68a N Visual Inspection Records 490-68b ❑Tank integrity testing results 490-68o <br /> ❑SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 490-68e <br /> ($�ATG Testing results(and supporting documentation records).490-68f ❑ Corrosion Protection 60-day logs 490-68g <br /> ®Equipment maintenance and calibration records. 490-68h <br /> IX.TRAINING <br /> R,Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> [� CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-6% <br /> STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> OTHER(Specify):M69h;M69i <br /> N_This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTSADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> U✓�r�i �l -F4GU,!,.-t-�itNj jD -provi e-,_A by -�Lp-per ucs '1n f0 i-x, Flcx,� <br /> XI.PERSONNEL RESPONSI ILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s responsible for performing the monitoring and equipment maintenance: <br /> NAME 4G6 490-72 TITLE 490-73 <br /> NAME <`ti 490-74 TITLE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNEItKWERATOR SIGNATURE <br /> CERTIFICATION:I certify tha he information provided herein is true and accurate to the best of my knowledge. <br /> APPLi ANT SI NATURE 490.76 DATE: 490-77 <br /> V!z 4-1c)17 <br /> REPRE ENTIN 1.T�Qwner/QD�eratorElFacili Owner/O erat r M 3.Authorized Re resentative of 0—er <br /> APPLICAN AME(print): 490-78 APPLICANT TITLE: 490-79 <br /> I&L le NZ <br /> Ij l <br /> UPCF UST-D(12/2007)3/4 •,�fr b-r <br />