Laserfiche WebLink
REGEIVEL, <br />Y 2 8 2015 <br />SPILL/OVERFILL CONTAINMENT BOXES <br />Al <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />='�c4������,��n�ne� <br />Spill/Overfill Containment Boxes are Present, but were Not Tested <br />Test Method Developed By: ❑Spill Bucket Manufacturer ❑ Industry Standard <br />❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum <br />❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: 1 Hour Observed Test <br />Equipment Resolution: 1/16 of an inch <br />NINE= <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between <br />applying <br />pressure/vacuum/water <br />and starting test: <br />Test Start Time: <br />Initial Reading (R): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF <br />R): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result:- - <br />❑ Pass ❑Fail <br />El Pass El Fail <br />E] Pass ` <br />❑Fail <br />El Pass El Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed <br />tests) <br />