My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1777
>
2300 - Underground Storage Tank Program
>
PR0232397
>
COMPLIANCE INFO_2009-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 1:49:50 PM
Creation date
6/3/2020 9:56:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2013
RECORD_ID
PR0232397
PE
2361
FACILITY_ID
FA0003978
FACILITY_NAME
KAISER FOUNDATION - MANTECA
STREET_NUMBER
1777
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
20018034
CURRENT_STATUS
01
SITE_LOCATION
1777 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\1777\PR0232397\PERMANENT INJUNCTION 05-11-11.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F.In-Tank Gauging/SIR Equipment: Check this box if tank gauging is used only for inventory control. <br /> R Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Yes 0 No* ias all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes s No* Nere all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes -�e, No* Nas accuracy of system product level readings tested? <br /> Yes No* Nas accuracy of system water level readings tested? <br /> �� Yes No* Were all probes reinstalled properly? <br /> r� Yes " No* ere all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes 00, No* For equipment start-up or annual equipment certifications—was a leak simulated to verify LLD performance?(Check all that <br /> g' N/A apply)Simulated leak rate:� `3 g.p.h.; r 0.1 g.p.h; I 0.2 g.p.h. <br /> Yes a No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> „<, Yes 0 No* Was the testing apparatus properly calibrated? <br /> Yesr;"'; <br /> No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> Yes �: No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> Yes OSI No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> 2b N/A <br /> rt Yes No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> N/A <br /> Yes 0No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> rol N/A <br /> Yes No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.