My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1777
>
2300 - Underground Storage Tank Program
>
PR0232397
>
COMPLIANCE INFO_2009-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 1:49:50 PM
Creation date
6/3/2020 9:56:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2013
RECORD_ID
PR0232397
PE
2361
FACILITY_ID
FA0003978
FACILITY_NAME
KAISER FOUNDATION - MANTECA
STREET_NUMBER
1777
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
20018034
CURRENT_STATUS
01
SITE_LOCATION
1777 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\1777\PR0232397\PERMANENT INJUNCTION 05-11-11.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-- SITE SAFETY PLAN <br /> CLIENT NAME�%S►► <br /> COMPANY NAME: �n�c2 <br /> PROJECT ADDRESS: <br /> PROJECT NUMBER: �(�3 <br /> A Site Safety Plan(SSP) has been designed to address safety provisions during the project. Its Purpose is to <br /> provide established procedures to protect all on-site personnel from direct skin contact, inhalation, or ingestion <br /> of potentially hazardous materials that may be encountered at the site. The SSP establishes personnel <br /> responsibilities, personal protective equipment standards, decontamination procedure, and emergency action <br /> plans. <br /> All personnel participating in the field must be trained in the general and specific hazards. All site personnel, <br /> project manager and/or site safety officer may impose any other procedures that they believe are necessary for <br /> safe operations. <br /> This plan is prepared to inform all field personnel, contractors, and subcontractors of the potential hazards on <br /> the site. However, each contractor or subcontract must assume direct responsibility for his own employees' <br /> health and safety. ^\ <br /> PLAN PREPARED BYom: "- <br /> PLAN APPROVED BY: <br /> PLAN REVISED BY: <br /> POSSIBLE HAZARDS ON THE JOB: <br /> 2. 7. 12. <br /> 8. 13. <br /> 4. 9. 14. <br /> 5. 10. 15. <br /> REQUIRED PERSONAL PROTECTIVE EQUIPMENT FOR THE PROJECT: <br /> 1. 5. 9. <br /> 2. � .� 6. 10. <br /> 3. ��-m�-.�S 7. 11. <br /> 4. 8. 12. <br />
The URL can be used to link to this page
Your browser does not support the video tag.