Laserfiche WebLink
SWRCB, January 2002 Page 7 of <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes <br />_ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested <br />Test Method Developed By: ❑ Spill Bucket Manufacturer Industry Standard X Professional Engineer <br />❑ Other (Sped) <br />Test Method Used: <br />❑ Pressure ❑ Vacuum X Hydrostatic <br />❑ Other (Sped) <br />Test Equipment Used: <br />Equipment Resolution: <br />Bx # S ill B <br />SSpill Box <br />Spill Box #F77 <br />Bucket Diameter: <br />11" <br />Bucket Depth: <br />12" <br />Wait time between applying <br />water and starting test: <br />10 Minutes <br />Test Start Time: <br />8:55 <br />Initial Reading (RI): <br />.001 <br />Test End Time: <br />9:25 <br />Final Reading (RF): <br />.001 <br />Test Duration: <br />30 Minutes <br />Change in Reading (RF -R,): <br />.000 <br />Pass/Fail Threshold or <br />Criteria: <br />.005/30 Minutes <br />Test Result: <br />X Pass ❑ Fail <br />❑ Pass ❑ Fail ❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />