Laserfiche WebLink
SWRCB,January 2002 Page I of 1 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes F <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested f�! <br /> Test Method Developed By: F, Spill Bucket Manufacturer r Industry Standard Professional Engineer <br /> Other(Specify): <br /> Test Method Used By: F, Pressure ry, Vacuum ri Hydrostatic <br /> Other(Specify): <br /> Test Equipment Used:VACUUM TEST Equipment Resolution:0.1 gph <br /> Spill Box#Tank"T1 <br /> r• u, � <br /> Die§e1 Fin�-Direct—... . .. .. Spill # p1sx# Sp1 # <br /> level <br /> r <br /> Bucket Diameter: 12.00 <br /> Bucket Depth: 13.50 <br /> Wait time between applying <br /> pressure/vacuum/water and 1 min min min min <br /> starting test <br /> Test Start Time: 11:15:00 <br /> Initial Reading(Rt): 30.00 in.H2O <br /> Test End Time: 11:16:00 <br /> Final Reading(RF): 29.00 in.H2O <br /> Test Duration: I min <br /> Change in Reading(RF-RI): -1.00 in.H2O <br /> Pass/Fail Threshold or Criteria: +/-4.00 +/- <br /> ,. <br /> AR I' s <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> WO:2313229 <br />