My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1777
>
2300 - Underground Storage Tank Program
>
PR0232397
>
COMPLIANCE INFO_2009-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 1:49:50 PM
Creation date
6/3/2020 9:56:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2013
RECORD_ID
PR0232397
PE
2361
FACILITY_ID
FA0003978
FACILITY_NAME
KAISER FOUNDATION - MANTECA
STREET_NUMBER
1777
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
20018034
CURRENT_STATUS
01
SITE_LOCATION
1777 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\1777\PR0232397\PERMANENT INJUNCTION 05-11-11.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page I of 1 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes F <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested f�! <br /> Test Method Developed By: F, Spill Bucket Manufacturer r Industry Standard Professional Engineer <br /> Other(Specify): <br /> Test Method Used By: F, Pressure ry, Vacuum ri Hydrostatic <br /> Other(Specify): <br /> Test Equipment Used:VACUUM TEST Equipment Resolution:0.1 gph <br /> Spill Box#Tank"T1 <br /> r• u, � <br /> Die§e1 Fin�-Direct—... . .. .. Spill # p1sx# Sp1 # <br /> level <br /> r <br /> Bucket Diameter: 12.00 <br /> Bucket Depth: 13.50 <br /> Wait time between applying <br /> pressure/vacuum/water and 1 min min min min <br /> starting test <br /> Test Start Time: 11:15:00 <br /> Initial Reading(Rt): 30.00 in.H2O <br /> Test End Time: 11:16:00 <br /> Final Reading(RF): 29.00 in.H2O <br /> Test Duration: I min <br /> Change in Reading(RF-RI): -1.00 in.H2O <br /> Pass/Fail Threshold or Criteria: +/-4.00 +/- <br /> ,. <br /> AR I' s <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> WO:2313229 <br />
The URL can be used to link to this page
Your browser does not support the video tag.