Laserfiche WebLink
RECEIVED <br /> SWRCB,January 2002 OCT 08 2M& Iofl <br /> 9. SPILUOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes EMVIRONMEN <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: r7. Spill Bucket Manufacturer Industry Standard ! Professional Engineer <br /> F Other(Specify): <br /> Test Method Used By: r.,— Pressure � Vacuum F Hydrostatic <br /> Other(Specify): <br /> Test Equipment Used:VACUUM TEST Equipment Resolution:0.1 gph <br /> f` Spill fox#lard Tf <br /> x � <br /> Diesel 2111 Direct Sill Box# pttl Box# > SpilBox <br /> l <br /> xrat level . �g <br /> r <br /> Bucket Diameter: 12.00 <br /> Bucket Depth: 13.50 <br /> Wait time between applying <br /> pressure/vacuum/water and I min min min min <br /> starting test <br /> Test Start Time: 11:15:00 <br /> Initial Reading(RI): 30.00 in.H2O <br /> Test End Time: 11:16:00 <br /> Final Reading(RF): 29.00 in.H2O <br /> Test Duration: 1 min <br /> Change in Reading(RF-RI): -1.00 in.H2O <br /> Pass/Fail Threshold or Criteria: +/-4.00 <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> WO:2313229 <br />