Laserfiche WebLink
July 14, 2015 <br />San Joaquin County 16 <br />Environmental Health Department <br />1868 E Hazelton Avenue <br />Stockton, California 95205 <br />GETTLER RYAN INC <br />6747 SIERRA COURT SUITE J <br />DUBLIN, CA 94568 <br />Website: www.sjcehd.com <br />Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />DIRECTOR <br />Linda Turkatte, REHS <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />Adrienne Ellsaesser, REHS <br />Rodney Estrada, REHS <br />9�tEro�r <br />Re: KAISER FOUNDATION - MANTECA SR0072522 <br />1777 W YOSEMITE AVE <br />MANTECA, CA 95337 <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of the <br />application for a permit to conduct a monitoring system "cold start" on the underground storage tank <br />(UST) system at the above noted address. This work was completed on June 18, 2015. The permit has <br />been approved with the following conditions: <br />1. Contact the local fire department and the San Joaquin Valley Air Pollution Control District for any <br />applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval prior to <br />commencing work. All new addenda supersede the previous ones. <br />3. Contact Elena Manzo at (209) 953-7699 to arrange the following appointments (a 48-hour notice is <br />required for inspection appointments). Please be aware that inspections for emergency work must be <br />scheduled within five days of permit approval. <br />• Sensor functionality: Functionality of the monitoring system must be verified to ensure that <br />monitoring has been restored to meet the requirements of Title 23 California Code of Regulations <br />and the Health & Safety Code. A copy of the alarm history shall be printed prior to performing <br />the "cold start" of the monitoring system and made available at the time of EHD inspection. <br />• Overfill prevention verification: Verify that external audible/visual alarm activates when tank is 90% <br />full. <br />Please be aware that the facility cannot receive fuel in the tank prior to the EHD inspection <br />and approval. <br />4. If concrete will be broken near the tank, a secondary containment test must be performed on the <br />tank once concrete is poured in accordance with the manufacturer's guidelines. <br />