My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1777
>
2300 - Underground Storage Tank Program
>
PR0232397
>
COMPLIANCE INFO_2013-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2023 9:06:11 AM
Creation date
6/3/2020 9:56:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2016
RECORD_ID
PR0232397
PE
2361
FACILITY_ID
FA0003978
FACILITY_NAME
KAISER FOUNDATION - MANTECA
STREET_NUMBER
1777
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
20018034
CURRENT_STATUS
01
SITE_LOCATION
1777 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\1777\PR0232397\MODIFICATION APPROVAL PLAN 2014.PDF
QuestysFileName
MODIFICATION APPROVAL PLAN 2014
QuestysRecordDate
11/16/2016 4:57:02 PM
QuestysRecordID
3258884
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9715517888 Line 1 <br />im GErrm-RYAN INC. <br />14:53:51 09-11-2014 414 <br />GR Job # 20-602042 <br />F. In -Tank Gauging / SIR Equipment: ff Check this box if tank gauging Is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment Is installed. <br />This section must be completed if in -tank gauging equipment Is used to perform leak detection monitoring. <br />Cmmnlata fha fnllnwlnn rha kaam. <br />UC 401re"Ca. <br />G. Line Leak Detectors (LLD): ix Check this box if LLDs are not installed. <br />Comolete the fnilnwlnn ehar_Nlut- <br />❑ <br />es <br />❑ <br />o <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Yes <br />❑ <br />NQ* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />rX <br />Yes <br />❑ <br />No' <br />Was accuracy of system products level readings tested? <br />rX <br />Yes <br />❑ <br />No' <br />Was accuracy of system water level readings tested? <br />IR <br />Yes <br />❑ <br />No` <br />Were all probes reinstalled properly? <br />Yes <br />❑ <br />No' <br />Were all Items on the equipment manufacturers maintenance checklist completed? <br />UC 401re"Ca. <br />G. Line Leak Detectors (LLD): ix Check this box if LLDs are not installed. <br />Comolete the fnilnwlnn ehar_Nlut- <br />❑ <br />Yes <br />® <br />o <br />or equipment start-up or annual equipment certification. was a leak simulated to verify D perforrrlance? (cher a 1 <br />❑ <br />NIA <br />that apply) Simulated leak rate: ❑ 3 g.p,h. ❑ 0.1 g.p.h. ❑ 0.2 g.p.h. <br />[] <br />Yes <br />❑ <br />No" <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />13 <br />Yes <br />❑ <br />No" <br />Was the testing apparatus property calibrated? <br />I] <br />Yes <br />❑ <br />No* <br />For Mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />NIA <br />❑ <br />Yes <br />❑ <br />No' <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ <br />N/A <br />❑ <br />Yes <br />❑ <br />No" <br />For electronic LLDs, does the turbine automatically shut off If any portion of the monitoring system is disabled or <br />❑ <br />NIA <br />Disconnected? <br />❑ <br />Yes <br />❑ <br />No' <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br />❑ <br />NIA <br />falls a test? <br />[3 <br />No* <br />For electronic LLDs, have all accessible wiring connections been visual inspected? <br />j❑Yes <br />EI <br />NIA <br />Yes <br />❑ <br />No` <br />were all items on the equipment manufacturer's maintenance checklist completed? <br />n t o .4Q—ti— <br />alma, el -4h. <br />G. Comments: <br />AIM <br />Monitoring System Certification Page 3 of 4 <br />17!07 <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.