My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1777
>
2300 - Underground Storage Tank Program
>
PR0232397
>
COMPLIANCE INFO_2013-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2023 9:06:11 AM
Creation date
6/3/2020 9:56:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2016
RECORD_ID
PR0232397
PE
2361
FACILITY_ID
FA0003978
FACILITY_NAME
KAISER FOUNDATION - MANTECA
STREET_NUMBER
1777
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
20018034
CURRENT_STATUS
01
SITE_LOCATION
1777 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\1777\PR0232397\MODIFICATION APPROVAL PLAN 2014.PDF
QuestysFileName
MODIFICATION APPROVAL PLAN 2014
QuestysRecordDate
11/16/2016 4:57:02 PM
QuestysRecordID
3258884
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CM Veeder-Root recommends conducting the following procedure prior to any Annual Certification or Operability test. <br />This procedure will help assist in identifying the operational status of the backup battery before removing power to <br />the ATG system. During this procedure the TLS power should remain on at all times unless specified. <br />1. Print out the System Setup. <br />2. Perform the "Archiving the System Setup" on page 4. <br />3. Again print out System Setup and verify that the Archived Setup matches the setup printed in Step 1. <br />M 4. For easier access to the ECPU and Battery, you may want to remove the printer door group. <br />5. Carefully remove printer ribbon cable between the printer and ECPU. Do NOT shut the Battery Switch off <br />(Down Position). <br />6. Using a Volt Meter, verify battery voltage for the applicable console by putting the positive lead on Resistor <br />151 shown in Figure 10) and the negative lead on any exposed metal of the console's chassis. Use the battery <br />test pads for voltage measurement, if available. <br />NOTE: TLS -350/350R ECPU boards manufactured after January 19th 2011 have Battery Test points located <br />below the dip switch area. The figure below shows the location of both the battery test pads and R151. <br />Figure 10. Battery voltage test locations on ECPU board <br />7. Does the volt meter read 3.4 to 3.6 Vdc? If Yes, Do not remove Battery. Battery is not defective do not remove <br />it, go to Step 14. If No, go to Step 8. <br />8. Using an insulated screw driver, push down and pull away on the battery cover that is attached to the ECPU <br />board. You may want to use your finger tips to help remove the battery cover. Please be careful you don't <br />touch any other circuits on the board (see Figure 11, A). After the top of the battery cover has dislodged, you <br />can pull the cover off with you finger tips (see Figure 11, B). <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.